Laserfiche WebLink
S W RC B,January 2002 Page _of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> T st Method Developed By: it UDC Manufacturer ❑ Industry Standard =] Professional Engineer <br /> ❑Other(Spec) <br /> Test od Used:---- "IIVacuum 'HydrosTatic <br /> ❑Other(Spec) <br /> Test Equipmenbsed: Equipment Resolution: <br /> UDC# UDC# UDC# DC# <br /> UDC Manufacturer: <br /> UDC Material: *.. <br /> UDC Depth: , <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: `. <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: ` <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both 11 Yes []No Cl NA I_J es ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes ❑No _ NA ❑Yes ❑No NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> safe shutdown? <br /> ai f <br /> Was ail-safe verified to be <br /> o as nal?� ❑ Yes o ❑NA F3Yes ❑No ❑N El ❑No 11NA 11Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Chane in Read' (RF-R,): <br /> Pass/Fail Th hold or Criteria: <br /> Test Res t: 1 ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑Fail ❑ P ❑ Fail <br /> Was se or removed for testing? ❑ Yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑ o ❑NA <br /> Was s,4nsor properly replaced and ] Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No NA <br /> verified functional after testin ? <br /> Com ments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to a_y of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />