Laserfiche WebLink
Yr <br /> O <br /> CaUEPA June 24, 1997 Pete Wilson <br /> 1 JUN 30 PM 1: 27 Governor <br /> State Water Ms. Lori Shields <br /> Resources Diesel Performance, Inc. <br /> Control Board <br /> P. O. Box 8387 <br /> Division of Stockton, CA 95208 <br /> Clean Water <br /> Programs <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 12341, <br /> Mailing Address: SITE ADDRESS: 2804 FREMONT ST. E,STOCKTON, CA 95205 <br /> P.O.Box 944212 <br /> Sacramento,CA <br /> 94244-2120 I have reviewed your request, received on June 17, 1997,for pre-approval of corrective action costs; 1 <br /> 2014 T street, will place these documents in your file for future reference. I have included a copy of the"Cost Pre- <br /> suite 130 Approval Request"form;please use this form in the future for requesting pre-approval of corrective <br /> Sacramento,CA <br /> 95814 actions costs. <br /> (916)2274374 <br /> FAX(916)2274530 With the following provisions,the total cost pre-approved as eligible for reimbursement for completing <br /> World Wide Web the Preliminary Site Assessment requested by the San Joaquin County PHS-EHD (County), is$4,104; <br /> hq://www.sv=b.m see the table below for a breakdown of costs. (Since you have not received your Letter of Commitment, <br /> govl-cwphomel <br /> fundhome.htm the total amount eligible for reimbursement for work at your site that has been directed and approved by <br /> the County is $0.) <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable and <br /> necessary corrective action costs for work directed and approved by the County will be eligible for <br /> reimbursement per the terms of your Letter of Commitment at costs consistent with those pre-approved <br /> in this letter. <br /> A11 future costs for corrective action must be approved in writing by Fund staff. <br /> Future costs for corrective action must meet the requirements of _ <br /> Article 11, Chapter 16, Underground Storage Tank Regulation, <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Comments <br /> Workplan Preparation 665.5 <br /> Three Soil Probes 1730.5 Soil probes to approximately 50 feet using <br /> direct push technology DPT <br /> Additional cost for three 566 As stated in proposal if DPT does not work, <br /> borings using hollow stem Diesel Performance will not be charged for <br /> auger subcontractor of Smith Environmental time. <br /> Soil Analysis 336.6 6 samples for TPHg/BTEX/MTBE, 6 samples <br /> for Lead <br /> Report Preparation 805 <br /> TOTAL PRE-APPROVED $4,104 <br /> Our mission is to preserve and enhance the quality of California's water resources,and <br /> .r Recycled Paper ensure their proper allocation and efficient use for the benefit ofpresent and future generations. <br />