My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1405
>
2900 - Site Mitigation Program
>
PR0505137
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 2:30:47 PM
Creation date
1/15/2020 1:23:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505137
PE
2960
FACILITY_ID
FA0006565
FACILITY_NAME
STOCKTON SOIL TREATMENT FAC
STREET_NUMBER
1405
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1405 S FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . William S . Rickman <br /> Page 5 <br /> July 29, 1988 <br /> identifiable species in the feed in excess of 1000 ppm (wt.) , mass <br /> emission rates shall be performed on total hydrocarbons or on weight <br /> segments of hydrocarbons. <br /> 5. Particulates shall be measured concurrently with the performance tests <br /> in item (4) by EPA methods 1-5. - <br /> 6. A Test Report shall be submitted within 60 days of completion of the <br /> demonstration test. This report -slaall contain all of the performance <br /> tests, operating conditions, calibrations of instruments, and all <br /> significant events which could have influenced the performance of the <br /> facility. The test report shall be submitted as a draft report, subject <br /> to DHS review, before finalizing. <br /> 7. A baseline performance test also shall be performed on uncontaminated <br /> soil. The baseline test shall be performed for a minimum period of 4 <br /> continuous hours operation under normal operating conditions of CBC. <br /> 8. Calibration of monitors described in items C. 3, 4, 5, and 6 shall occur <br /> before and after each sampling period. <br /> E. Other Conditions <br /> 1. All Federal, state, or local statutes, regulations, ordinances, <br /> requirements, or limitations that are applicable to your project shall _ <br /> be followed. All requirements and limitations of the permits issued by <br /> the San Joaquin County Air Pollution Control District, Central Valley <br /> Regional Water Quality Control Board, San Joaquin County Local Health <br /> District, and the City of Stockton Planning Department shall be met <br /> during the proposed site remediation project. <br /> 2. The Health and Safety Plan dated July 1988 must be implemented and <br /> followed. <br /> 3. A monthly report shall be submitted to the below listed Sections of DHS <br /> no later .than the 15th day of the following month that summarizes the <br /> monitoring data listed in Section C of this variance, including <br /> calibrations, continuous monitoring data, and significant events at the <br /> facility. Also include equipment failure and wear events. <br /> Northern California Section <br /> Toxic Substances Control Division <br /> 4250 Power Inn Road <br /> Sacramento, CA 95826 <br /> Attention: Chuck White <br />
The URL can be used to link to this page
Your browser does not support the video tag.