My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:25:25 PM
Creation date
1/15/2020 2:31:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Lori Duncan [EH] <br /> From : Jessica Moreno [JMoreno@clearwatergroup.com] <br /> Sent: Thursday, November 15, 2007 11 :55 AM <br /> To : Lori Duncan [EH] <br /> Subject: Barnes Trucking, 1817 South Fresno Ave, Stockton <br /> i <br /> Greetings Lori, <br /> I <br /> Clearwater is working on the necessary permit applications for the completion of the proposed soil borings on <br /> South Fresno Avenue. Thinking ahead to the report, I would like to include information regarding previous <br /> investigation event/s that have been conducted along South Fresno Avenue with the results of the event we are <br /> about to complete. We have gone through our historical files and have been unable to locate our copy of the <br /> Additional Assessment and Quarterly Groundwater Monitoring First Quarter 2000. <br /> According to subsequent reports, this report included the results of two soil borings, SB-9 and SB- 10, that were <br /> completed North of the site on both the eastern and western sides of the street. This report was completed prior <br /> to the change in ownership of Clearwater and the move of the main office from Oakland to Pt. Richmond . I am <br /> assuming that our copy of the report was misplaced during the transition period . Besides SB-9 and SB- 10, our <br /> historical files do not mention any other soil borings completed along South Fresno Avenue. <br /> Would it be possible for you to send me a copy of the Additional Assessment and Quarterly Groundwater <br /> Monitoring First Quarter 2000 report? Otherwise I will go ahead and schedule a file review, please advise. <br /> Sincerely, <br /> Jessica Moreno <br /> Project Manager <br /> Clearwater Group <br /> 229 Tewksbury Avenue <br /> Point Richmond , CA 94801 <br /> Tel : (510) 590-1096 <br /> Fax: (510) 232-2823 <br /> www.clearwaterorou p.com <br /> NOTICE — This communication may contain confidential and privileged information that is for the sole use of the intended recipient. <br /> Any viewing, copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have <br /> received this message in error, please notify us immediately by replying to the message and permanently deleting it from your <br /> computer. Thank you. <br /> Pwn c. ll�� dV � '7V � °M ' If �P � _ <br /> �-� � ^� <br /> il /ls �o } � <br /> 11/15/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.