Laserfiche WebLink
Craig Rous -2 - 7 July 2017 <br /> Bear Creek Winery <br /> On 29 June 2017, Staff had a phone conversation with FCE regarding the comments. <br /> On 30 June 2017, FCE submitted an email stating that the recommended 60-mil HDPE liner will <br /> be considered. FCE staff also stated a separate Operations and Maintenance Plan (O&M <br /> Plan) for the system will be prepared. The O&M plan will describe the operations and <br /> maintenance procedures for the installed wastewater treatment system. The O&M Plan will <br /> also include the inspection procedures and frequency for the installed liner. This is a separate <br /> document from the Construction Quality and Assurance Plan. <br /> Therefore the Pond Design Work Plan and Construction Quality and Assurance Plan are <br /> conditional approved. By 1 February 2019, the Discharger shall submit an O&M Plan as a part <br /> of a Wastewater System Improvements Phase l/ Completion Report required in Provision H.1.g. <br /> of the WDR. The O&M Plan shall describe the operations and maintenance procedures for the <br /> installed wastewater treatment system. The O&M Plan shall also specify the means and methods <br /> to evaluate integrity of all geosynthetic liner systems for future maintenances to meet the <br /> requirements of Provision H.1. f of the WDRs . <br /> If you have any questions, please contact me at (916) 464-4689 or Ifu (a)-waterboards.ca.00v. <br /> II y <br /> LIXIN FU, P.E. <br /> Water Resource Control Engineer <br /> Waste Discharge to Land Permitting Unit <br /> cc: Rodney Estrada, San Joaquin County Environmental Health Department, Stockton <br /> Peter Haase, Fall Creek Engineering, Inc., Santa Cruz <br />