Laserfiche WebLink
' 14 April 2006 <br /> • AGE-NC Project No 95-0184 <br />' Page 2of5 <br /> 21 SVE PILOT TEST <br /> The pilot test was initiated at 8 30 am and continued for approximately 8 hours, after the initial four <br /> hours (phase I), the extraction well was switched from VW-5A to VW-513 (phase H} An induced <br />' vacuum potential was applied to each casing, respectively of VW-5A and VW-5B The <br /> vacuum-induced pressure reduction was monitored at surrounding observation points (VW-5A/13, <br />' VW-2A,VW-3,VW-4,and EW-1)with air-tight well caps pre-connected with Magnehelic vacuum <br /> gauges fitted to each observation well A sample port was tapped into the PVC near the wellhead and <br /> a portable organic vapor meter equipped with a photo-ionization detector (PID Thermo <br />' Environmental 580, 10 0 eV, calibrated to isobutylene) was used to measure organic vapor (OV) <br /> concentrations The organic vapor concentrations,the induced vacuum potential at the observation <br /> points, extracted soil gas flow rate, and revolutions per minute (RPM) of the SVE unit were <br />' measured at 0 25-hour to 0 5-hour intervals and logged on field sheets Pilot test data are <br /> summarized in Table 1 L41' � � <br /> 4A�ati <br /> A Solinst water level meter was used-to measure the depth to ground water in monitoring wells <br /> MW-1 through MW-3,rQEdT�W-5(A-�},vapor wells VW-2(A-4, VW-3, and VW-4, and ground <br /> water extraction wells EW-1 ;r b�lative to the tops of the well casings prior to the initiation <br /> of the SVE pilot test Depths to groundwater were re-measured in wells MW-2,MW-3,and VW-3 <br /> just prior to the termination of the 8-hour test, water levels had not changed significantly over the <br /> duration of the test in any of the wells monitored <br /> 22 SVE PILOT TEST SAMPLING AND ANALYSIS <br /> A total of eight soil gas/vapor samples were collected during the pilot test,four were collected during <br /> phase I of the pilot test, and four during phase II Soil gas/vapor samples were collected at one-hour <br /> intervals from the sample port of the extraction well to measure hydrocarbon concentrations in the <br /> extracted gas/vapor The samples were collected in 1,000 ml Tedlar bags vacuum chamber and an <br />' vacuum pump Samples were transported in a chilled container under chain-of-custody to Caltech <br /> Environmental Laboratories (CTEL), a California Department of Health Services (DHS)-certified <br /> laboratory I Each sample was analyzed within 72 hours for -,,,� ' <br /> vft <br /> - Total petroleum hydrocarbons quantified as gasoline (TPH-g), Q ml <br /> Benzene, toluene, ethylbenzene, and total xylenes (BTEX), methyl tertiary butyl ether -�, <br />' (MTBE),t-butyl alcohol(TBA),diisopropyl ether(DIPS),ethyl-t-butyl-ether(ETBE),t-amyl ,. <br /> methyl ether (TAME), 1,2-Dichloroethane (1,2-DCA) and 1,2-Dibromoethane (EDB) in ,rH J <br /> accordance with EPA Methods 8260B S A <br />' Advanced GeoEnvironmental,Inc <br />