Laserfiche WebLink
' Site control measures and safe work practices that will be implemented for the Treadwell & <br /> Rollo project tasks include <br /> ' <br /> • Project preparation including availability of health and safety equipment and <br /> engineering controls, <br /> • Enforce the use of personal protective clothing and equipment, <br /> ' • Establish safe work practices - use engineering and administrative controls to reduce <br /> the physical hazards at the Site, <br /> • Implement the buddy system (no person shall be permitted to work alone - drillers or <br /> ' other subcontractors can fulfill the role of buddy) for the following purposes <br /> ' • Provide assistance as necessary, <br /> • Observe for signs of chemicals or heat exposure, <br /> ' • Check integrity of personal protective clothing, and <br /> ' • Notify others if emergency services are needed <br /> • No smoking, eating, or drinking in the work area Prior to eating and drinking, wash <br /> ' hands and face with soap and water and shower after work, <br /> • Contact lenses may not be worn on Site, if chemical substances enter the eyes,proper <br /> ' flushing would be impeded, <br /> ' • Implement decontamination procedures for personnel and equipment, <br /> • Establish and maintain communication between personnel, and <br /> 1 • Field activities will be halted if unforeseen hazards occur which necessitate greater <br /> ' precautions <br /> ' Site Health&Safety flan 10 08/14/03 <br /> TREADWELL&ROLLO,INC <br />