My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011666
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
541
>
2900 - Site Mitigation Program
>
PR0516430
>
ARCHIVED REPORTS_XR0011666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 1:42:23 PM
Creation date
1/22/2020 1:35:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011666
RECORD_ID
PR0516430
PE
2950
FACILITY_ID
FA0012598
FACILITY_NAME
GRANT LINE AUTO CENTER
STREET_NUMBER
541
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
98376
APN
21449004
CURRENT_STATUS
01
SITE_LOCATION
541 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 5.4 General Decontamination Procedures <br /> Equipment coming into contact with potentially contaminated soil and groundwater will be <br /> ' cleaned after use in the DZ Proper decontamination procedures greatly reduce the potential for <br /> cross-contamination The DZ will be established as discussed in Section 5 3 General <br /> decontamination procedures may include washing in a solution of phosphate-free detergent and <br /> ' rinsing with clean water More specific decontamination procedures shall be identified in the <br /> individual work plans Disposable clothing(i e , Tyvek coveralls, gloves) will be changed as <br /> I ' needed to reduce the risk of cross-contamination All contaminated materials shall be properly <br /> containerized and appropriately disposed <br /> ' 5.5 Confined Space Entry <br /> The proposed work tasks to be performed at the Site will not require personnel to enter confined <br /> spaces No Treadwell & Rollo employee will enter a confined space if a confined space <br /> ' environment is present or suspected, immediately notify the Site Safety Officer <br /> 6 0 EMERGENCY RESPONSE PLAN <br /> Emergency response procedures include pre-emergency planning, lines of authority and <br /> communication, emergency recognition and prevention, Site control, evacuation routes, <br /> ' decontamination, and emergency medical treatment and first aid Many of these items have been <br /> previously discussed in other sections The Site Safety Officer is the primary authority for <br /> ' directing Site operations under emergency conditions Emergency communications both on and <br /> offsite will additionally be directed through the Health & Safety Manager and the Project <br /> Manager The field team members will first notify the Site Safety Officer and then notify the <br /> Health & Safety Manager of the situation immediately after emergency procedures are <br /> implemented <br />' Sate Health&Safety Plan08/14/03 <br /> 11 <br /> TREADWELL &ROLLO, INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.