Laserfiche WebLink
SECTION 4 - GENERAL PREVAILING RATE OF PER DIEM WAGES <br /> The Contractor is hereby notified that pursuant to Section 1770 et seq of the Labor <br /> Code of the Statutes of the State of California, the City Council of the City of Tracy has <br /> ascertained the general prevailing rate of per diem wages and the rates for legal holiday <br /> and overtime work for the locality in which the work is to be performed, for each craft or <br /> type of workman or mechanic needed to execute the Contract which will be awarded the <br /> successful bidder <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed <br /> SECTION 5 - PRECONSTRUCTION CONFERENCE <br /> Subsequent to the execution of the project contract, the City shall designate a date and <br /> time for the pre-construction conference The Contractor shall, at the pre-construction <br /> conference, present a project construction schedule, anticipated timing of invoices for <br /> work completed, a list of material suppliers, and a traffic control plan required by Section <br /> 1 7 11 of the City of Tracy Standard Specifications At this meeting, the Contractor shall <br /> also submit plans for the coordination with the various utility companies <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed <br /> SECTION 6 - PROGRESS SCHEDULE AND ORDER OF WORK <br /> The Contractor shall submit to the Engineer a practicable progress schedule within ten <br /> (10) calendar days of the "Notice to Proceed", and within five (5) calendar days of the <br /> Engineer's written request at any other time The schedule shall show the order in <br /> which the Contractor proposes to carry out the work, the dates on which he will start the <br /> several salient features of the work (including procurement of materials and equipment), <br /> and the contemplated dates for completing the said salient features <br /> As provided in Section 6-01 of the Standard Specifications of the City of Tracy, <br /> "Progress and Acceptance of Work", the Contractor is advised that the Engineer may <br /> further direct by areas on the site, the order of installation of each mayor item of work so <br /> that succeeding mayor items of work may have timely and simultaneous access and that <br /> failure to comply with directions of the Engineer concerning the order of work may be <br /> cause for damages should work under the same be delayed <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices pard for the various contract <br /> items of work involved and no additional compensation will be allowed <br /> August 2001 Division 11 -3 Sall Park & Park& Ride Wells Ph 1 <br />