Laserfiche WebLink
SECTION 17 - DISPOSAL OF MATERIAL <br /> Unless otherwise shown on the plans or specified herein, all excess materials (except <br /> drill cuttings) shall become property of the Contractor and disposed of by the Contractor <br /> The City will accept the drill cuttings from the Well sites upon the Contractor's delivery of <br /> them to the WasteWater Treatment Plant located on Arbor Road The Contractor shall <br /> be responsible for disposing all excess materials in a safe and legal manner No <br /> material shall be placed on private property or public property without prior approval <br /> from the City and the property owner The Contractor shall not allow any refuse, <br /> excavated material, surplus concrete or mortar, or any washings therefrom, to be <br /> disposed upon paved streets or, into catch basins <br /> Wastewater from drilling and development/test pumping shall be disposed of to the <br /> satisfaction of the Engineer The Contractor shall take care to discharge the fluids in <br /> such a manner that does not cause pollution, erosion, rutting of the ground surface, <br /> other damage to the existing land condition, flooding, increased turbidity, or other <br /> damage to property Fluids containing silt, sand or mud shall be treated by retention in <br /> settling ponds/tanks or by filtration in order to prevent Undesirable fluids from entering <br /> the City's storm drain system The Contractor shall, as part of his pre-bid project <br /> reconnaissance, determine what temporary disposal pipeline routes are required and <br /> the pipe lengths that will be needed The temporary disposal pipelines shall be laid <br /> along routes approved by the Engineer and in a safe manner <br /> All materials removed from the existing improvements, which in the opinion of the <br /> Engineer have salvage value but not reused, shall be delivered to the City Corporation <br /> Yard at 520 Tracy Boulevard, at no additional cost to the City <br /> Disposal of materials shall conform to the provision of Section 300 02 "Disposal of <br /> Materials" of the City of Tracy Standard Specifications <br /> ' The Contractor shall be charged prevailing dumping fees at the County's landfill site, <br /> , <br /> should the Contractor elect to dispose of waste material at that particular site <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed <br /> SECTION 18 - CONSTRUCTION WATER <br /> Construction water is available at no cost to the Contractor The Contractor is responsible <br /> for obtaining the required permit from the City and complying with all City backflow <br /> prevention requirements prior to obtaining any construction water from City hydrants If a <br /> water truck is to be employed, Contractor is to provide an approved water truck, complete <br /> with backflow prevention devices <br /> iFull compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed <br /> August 2001 Division 11 -9 Bail Park& Park& Ride Wells Ph 1 <br />