Laserfiche WebLink
The inspection of the work shall not relieve the Contractor of any obligations to fulfill this <br /> Contract as prescribed Defective work shall be made good and unsuitable materials <br /> ' may be rejected, not withstanding that such defective work and materials have been <br /> previously overlooked by the Engineer and accepted or estimated for payment <br /> The Contractor's attention is directed to Section 6 09 of the City of Tracy Standard <br /> Specifications regarding the completion and acceptance of the work <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed <br /> iSECTION 21 -TESTING <br /> Testing is required for compaction, gradation, and asphalt concrete properties (additional <br /> tests may be requested by the Engineer), and all testing will be provided by an <br /> independent laboratory called for and paid for by the City The cost of failing tests will be <br /> charged to the Contractor <br /> Whenever a reference is made in the specifications to a California Test by numbers, it <br /> shall mean the California Test is in effect on the day the Notice Inviting Bids is dated <br /> SECTION 22 - "AS-BUILT" PLANS <br /> The Contractor shall prepare and update, in red ink, "As-Built" plans at the end of every <br /> month The Contractor shall submit to the City a complete set of"As-Built" plans prior to <br /> acceptance of the project <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> ' items of work involved and no additional compensation will be allowed <br /> I <br /> SECTION 23 - COORDINATION WITH ADJACENT PROPERTY OWNERS AND <br /> MAINTAINED ACCESS TO PROPERTIES <br /> The Contractor shall coordinate with the adjacent property owners and maintain access to <br /> their properties at all times Temporary asphalt access ramps shall be provided and <br /> maintained by the Contractor to all properties requiring temporary closure of their existing <br /> driveways <br /> ' If the contractor needs to shut down the existing sewer or water services, it shall be done <br /> in accordance with Section 19 of these Special Requirements and as directed by the <br /> Engineer <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed <br /> I <br /> ' August 2001 Division II -11 Ball Park & Park & Ride Wells Ph 1 <br />