Laserfiche WebLink
The Engineer approval of submittals shall not relieve the Contractor from the <br /> responsibility of meeting the requirements of the Contract Documents The Engineer <br /> i review of submittals is for compliance with the design intent and requirements of the <br /> Contract Documents If later information reveals that work or items submitted or <br /> furnished do not meet the requirements of the Contract Documents or the Work as a <br /> whole, the Engineer's favorable review shall be void and the items or work shall be <br /> considered defective The Contractors shall not perform work for which reviewed <br /> submittals are required without obtaining approval of those submittals <br /> The Contractor shall make the submittals in time to allow for the Engineer review and <br /> resubmittal, if required, without causing delay to the Work The Contractor shall review, <br /> stamp, date, and sign submittals before sending them to the Engineer By making such <br /> a submittal, the Contractor makes the following warranty and shall include these <br /> warranty statements on the letter of transmittal The Contractor warrants that <br /> 1 All equipment, product items, and proposed equivalent items submitted meet the <br /> requirements of the Contract Documents and are equal in quality, utility, and <br /> appearance to the originally specified item, or else any deviations are identified <br /> in a separate letter accompanying the submittal, <br /> 2 All work or items submitted have been coordinated with and meet the <br /> irequirements of the other submittals, field conditions, and the work as a whole, <br /> 3 Adjustments to other work required to accommodate the proposed equivalent <br /> items have been delineated on the submittal and will be made at the Contractor's <br /> expense, <br /> 4 Data sheets, catalogue pages, brochures, shop drawings, samples, performance <br /> charts, instructions, and other information pertaining to the specified equipment, <br /> products, or proposed equivalents have been highlighted on the submittals and <br /> i have been certified, as required, by the Contractor to indicate their compliance <br /> with some portion of the work, <br /> When the specified item is followed by an "or equal," the Contractor may submit <br /> proposed equivalent items for the Engineer's review Where the term "or equal" is <br /> omitted, it means that the named item is required to meet the City's needs, and no <br /> products or makers other than those specified will be considered <br /> MEASUREMENT AND PAYMENT <br /> 1 No measurement will be made Full compensation for conforming to these <br /> requirements, not otherwise provided for, shall be considered as included in the prices <br /> ' paid for the various contract items of work involved and no additional compensation will <br /> be allowed <br /> i <br /> • <br />, i <br /> ' August 2001 Division 111 -2 Ball Park& Park & Ride Wells Ph 1 <br />