At the end of each workday the Contractor shall remove all components of the traffic
<br /> control system, except portable delineators placed along a pavement elevation
<br /> differential, or as required by the Engineer
<br /> Before obstructing any private driveway entrance or City street with equipment or other
<br /> barriers, for any prolonged period of time, the Contractor shall notify the known users of
<br /> the respective thoroughfare(s) involved and shall provide access for pedestrian traffic to
<br /> and from the street
<br /> The fact that rain or other causes may force suspension or delay of the work shall not
<br /> relieve the Contractor of his responsibility for maintaining traffic around the project and
<br /> providing local access as specified herein The Contractor shall at all times keep on the
<br /> job such materials and equipment as may be necessary to keep streets and driveways
<br /> within the project area open to traffic and in good repair
<br /> Should the Contractor fail, in the opinion of the Engineer, to provide all the materials,
<br /> work force and equipment necessary to maintain traffic around the work area as set
<br /> forth herein, the City, upon the recommendations of the Engineer, may take steps
<br /> necessary to suspend the Contract The City may then, upon such suspension, cause
<br /> such work to be done as may by necessary to maintain traffic, and charge same against
<br /> the Contractor and sureties
<br /> The adjustment provisions in Section 4-1 03, "Changes", of the Standard Specifications,
<br /> shall not apply to the item of traffic control system Adjustments in compensation for
<br /> traffic control system will be made only for increased or decreased traffic control system
<br /> required by changes ordered by the Engineer and will be made on the basis of the cost
<br /> of the increased or decreased traffic control necessary Such adjustment will be made
<br /> on a force account basis as provided in Section 9-1 03, "Force Account Payment", of the
<br /> Standard Specifications for increased work, and estimated on the same basis in the
<br /> case of decreased work
<br /> In lieu of payment as extra work as specified in Section 7-1 08, of the Standard
<br /> Specifications, the cost of furnishing, installing and maintaining signs, lights, barricades,
<br /> and other facilities for the safety, sole convenience, and direction of public traffic around
<br /> the work area, all as shown on the plans or as directed by the Engineer, shall be
<br /> considered as included in the various Contract items of work and no additional
<br /> compensation will be allowed
<br /> In lieu of Section 12-2 02, of the Standard Specifications, the cost of furnishing all
<br /> flagman to provide for the passage of public traffic through the work area under the
<br /> provisions in Section 7-1 08 and Section 7-1 09, of the Standard Specifications, shall be
<br /> considered as included in the various Contract items of work and no additional
<br /> compensation will be allowed
<br /> MEASUREMENT AND PAYMENT
<br /> Full compensation for conforming to the requirements of this section, not otherwise
<br /> provided for, including all the labor (including flagging costs), materials, (including
<br /> Construction Area signs), tools, equipment, incidentals, and for doing all the work
<br /> involved in Traffic Control, including installing, maintaining, relocating, and removing the
<br /> components of the Traffic Control system throughout the duration of the project
<br /> (including Saturdays, Sundays, and holidays), all as specified in the Standard
<br /> Specifications, these special provisions, and as directed by the Engineer, shall be
<br /> August 2001 Division 111 -5 Ball Park& Park & Ride Wells Ph 1