My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
ARCHIVED REPORTS_XR0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:11:18 AM
Creation date
1/23/2020 9:28:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002230
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 03 STANDBY <br /> A During the progress of well construction, it may be necessary for the Engineer to <br /> perform work that will require the drilling crew and equipment to stand idle In <br /> such event, the Engineer will request the Contractor in writing to cease operations <br /> and will state the anticipated extent or duration of the standby time The <br /> Contractor shall promptly furnish such needed assistance and small take all steps <br /> necessary to prevent loss or damage to the well <br /> B Payment for standby time will be paid on an hourly rate as bid by the Contractor <br /> and in accordance with the actual hours as determined by the Engineer <br /> C Idle time of the drilling crew and equipment not ordered in writing by the Engineer <br /> and time for repair and maintenance of the Contractor's equipment will not be <br /> reimbursable under this contract <br /> PART 2 - MATERIALS <br /> 2 01 GENERAL <br /> Provide a complete reverse circulation rotary drilling unit in which the uncased wall of <br /> the drill hole is held in place at all times with a circulating fluid Provide tools, <br /> accessories, power, lighting, water, other equipment, and experienced personnel <br /> necessary to conduct efficient drilling operations at the site <br /> 2 02 DRILL RIG AND PIPE <br /> A The drilling unit and associated equipment for the production wells shall be in good <br /> condition capable of lowering the 18-inch casing and screen for the production <br /> wells to the approximate depth shown below without floatation and have a <br /> minimum drilling capacity according to the following schedule <br /> I <br /> Purpose Capacity <br /> Production 32-inch-dia hole <br /> Wells to the depth of 1000 feet <br /> B The drilling pipe shall be in good condition and shall be connected by standard tool <br /> or flange-type points However, if flange-type drill pipe is used, do not use air <br /> wrenches to make connections after 8 00 p m or before 7 00 a m in areas where <br /> residences are less than 500 feet away Either internal or external air lines may be <br /> used Provide sufficient air line onsite so that the well can be drilled to its entire <br /> depth Do not use periodic exiting from the well to install blank drill pipe for lack of <br /> adequate quantities of air line-equipped pipe <br /> C Equip the drilling rig with instruments capable of continuous chart recording of drill <br /> penetration rate and weight on the drill <br /> 203 MUD TANKS <br /> The mud tank(s) shall be of a volume and shape to remove cuttings from drilling <br /> operations and return fluid suitable for reverse circulation drilling The mud tank(s) shall <br /> be cleaned periodically to maintain proper drilling fluid characteristics <br /> August 2001 Division 111 -19 Ball Park& Park& Ride Wells Ph 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.