Laserfiche WebLink
This section includes a television well survey, supplying the specified disinfectant to the <br /> wells, and well capping <br /> 1 <br /> 1 02 MEASUREMENT AND PAYMENT <br /> A Payment for the Television Well Survey shall be paid for on a lump sum <br /> basis The contract lump sum price paid for the Television Well Survey (Bid Item <br /> No s A24 & B24) shall include full compensation for conforming to these <br /> requirements, furnishing all the labor, materials, tools, equipment, incidentals <br /> and for doing all the work involved in Television Well Survey necessary for <br /> completion of the work, as shown on the contract plans, as specified in the <br /> Standard Specifications and these special provisions and as directed by the <br /> Engineer and no additional compensation will be allowed Measurement will be <br /> based on the percentage of work completed as determined by the Engineer <br /> B Payment for Well Disinfection & Well Capping shall be paid for on a lump <br /> sum basis The contract lump sum price paid for the Well Disinfection & Well <br /> Capping (Bid Item No s A25 & B25) shall include full compensation for <br /> conforming to these requirements, furnishing all the labor, materials, tools, <br /> equipment, incidentals and for doing all the work involved in Well Disinfection & <br /> Well Capping, necessary for completion of the work, as shown on the contract <br /> plans, as specified in the Standard Specifications and these special provisions <br /> and as directed by the Engineer and no additional compensation will be allowed <br /> Measurement will be based on the percentage of work completed as determined <br /> by the Engineer <br /> PART 2 - MATERIALS <br /> 2 01 DISINFECTANT <br /> The chlorine solution used for disinfecting the well shall be of such volume and strength <br /> and shall be so applied that a concentration of at least 100 mgll of chlorine shall be <br /> obtained in all parts of the well water plus the borehole volume at the well screens <br /> PART 3 - EXECUTION <br /> 3 01 TELEVISION WELL SURVEY <br /> After completion of all work on the well and before the well is disinfected and capped, <br /> the Contractor shall run a color television survey of the entire well, from top of casing to <br /> total depth The survey shall be performed using a downward-looking video camera <br /> accompanied by an appropriate light source The survey shall be recorded on standard <br /> VHS -format tape which shall show a continuous display of the depth of the camera, in <br /> M feet One (1) copy of this tape shall be provided to the Engineer and one (1) copy to the <br /> City within five (5) working days after completion of the television well survey <br /> 3 02 DISINFECTION <br /> Foreign material shall be removed by bailing and the specified quantity of chlorine <br /> solution shall be added to the wells via an injection line submerged approximately 100 <br /> August 2001 Division 111 -36 Ball Park& Park& Ride Wells Ph 1 <br />