My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002376
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
10
>
3500 - Local Oversight Program
>
PR0545191
>
ARCHIVED REPORTS_XR0002376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 11:31:56 AM
Creation date
1/23/2020 11:27:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002376
RECORD_ID
PR0545191
PE
3528
FACILITY_ID
FA0005301
FACILITY_NAME
JERRY & BARBARAS DEMOLITION
STREET_NUMBER
10
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
10 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wright performed a soil and groundwater investigation both in the vicinity of the former <br /> tanks and in the assumed downgradient direction (see Wright report dated April 21, 2000) <br /> That study revealed low concentrations of apparently degraded petroleum contaminants <br /> near the former tank pits, however, an elevated dissolved contammant concentration was <br /> observed at exploratory Bonng Three (B-3) After a review of this report, the PHS EHD <br /> has required installation of at least one groundwater monitoring well at the B-3 location <br /> Field Methods <br /> E�plorat=Drilling and Sam�g <br /> One exploratory boring was drilled at the site (see Figure 1) The boring was positioned at <br /> the Boring B-3 location, and adjusted as required given utility proximity Drilling and well <br /> installation permits were secured from the PHS EHD, and all utilities were cleared prior to <br /> doing the field work The boring was advanced to define the uppermost water bearing <br /> strata as in the previous borings, and advanced to the contact of the underlying local <br /> confining strata immediately below the uppermost water bearing strata <br /> The borehole was drilled with truck mounted hollowstem auger drilling equipment All <br /> drilling equipment and sampling tools were cleaned prior to arriving, and before leaving the <br /> site The augers were advanced to the desired sampling depth interval, and a drive split <br /> spoon sampler was driven ahead of the drill bit The sampler was retrieved and <br /> dissembled, and the soil filled brass liners were opened and logged <br /> The borehole was logged using the Unified Soil Classification System under the <br /> supervision of a registered geologist Additional hthologic information was collected to <br /> describe the subsurface geology Upon completion of the borehole drilling and information <br /> collection, one monitoring well was installed in the borehole <br /> Monitgang Well I,.n514llatnon One monitoring well was installed using Sch 40 PVC casing, <br /> threaded together, glues were not be used The slotted interval used a 0 020 inch slot and <br /> the annular space around the slots was backfilled with a 2112 size sand Previous <br /> experience has shown this to be a reliable well design in fine grained and stratified <br /> depositional environments The final well design was modified to the site specific <br /> conditions encountered in the borehole during drilling Once the aquifer strata interval was <br /> defined, the casing was lowered to the bottom of the borehole, leaving a slotted interval <br /> above the occurrence of groundwater to observe for floating product The sand pack was <br /> placed to a point about two feet above the slots The sandpack was surged to emplace the <br /> sandpack at the desired location prior to bentonite placement <br /> A bentonite seal was placed atop the sand pack, and a cement grout seal placed atop the <br /> bentonite using a trerrue line, filling from the bottom to top of the borehole A traffic rated <br /> well head access box and security device completed the wellhead <br /> Monitonng Well Sam�li g and Development The monitoring well was developed to <br /> remove the drilling muck, grade the sand pack and provide a more complete hydraulic <br /> connection to the aquifer A well development log was kept of the well volumes removed <br /> until the water cleared and the amount of sand pumped was minimal The well was <br /> allowed to recover for at least 72 hours prior to sampling <br /> Well Casing Elevation Survey <br /> The monitoring well casing elevation was surveyed by Triple "F' Engineering to a known <br /> elevation datum so accurate groundwater elevations and flow gradient can be measured <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.