My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
13170
>
2900 - Site Mitigation Program
>
PR0505432
>
FIELD DOCUMENTS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 2:57:17 PM
Creation date
1/24/2020 2:31:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 2
RECORD_ID
PR0505432
PE
2960
FACILITY_ID
FA0006779
FACILITY_NAME
DIVIDEND PROPERTY
STREET_NUMBER
13170
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
13170 W GRANT LINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dividend Development Corporation May 13, 1991 <br /> Workplan to Determine Extent of Soil Contamination page 3 <br /> WELL INSTALLATION: <br /> A State of California licensed contractor with a C-57 license will <br /> be responsible for the drilling activities. ' The hollow stem auger <br /> method will be utilized to facilitate both sample collection and <br /> well construction. These activities will be completed under the <br /> direct supervision of a .registered geologist from Toxic Technology, <br /> Inc. <br /> WELL CONSTRUCTION: <br /> The monitoring wells will be constructed with Schedule 40, two-inch <br /> (211) , flush thread, PVC casing with .0020 slots. The annular space <br /> of the well will be filled with a #3 Monterey Sand filterpack, a <br /> bentonite seal will be placed above the filter pack and a bentonite <br /> cement .grout will be placed above this and completed to the <br /> surface. The surface completion will consist of a locking monument <br /> coverbox cemented into place. The covers will .be numbered for easy <br /> well identification (Reference Typical Groundwater Monitoring Well, <br /> enclosed) .. The anticipated depth of the monitoring well is <br /> approximately twenty to twenty-five feet below ground surface (201 <br /> to 251 bgs) . The first shallow aquifer in this area is reported to <br /> be between eight and fifteen feet (a , to 151 ) deep. It' . is <br /> ` <br /> anticipated that ten feet (101 ) of penetration into the aquifer <br /> will be sufficient to allow a good recharge rate and provide <br /> representative water samples. <br /> i <br /> Toxic Technology, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.