Laserfiche WebLink
Spill Prevention Compliance Corporation <br /> Periodic Integrity Test Certificate <br /> P.O. Box 1289........Waterford, CA 95386 Telephone: (209) 969-0851 <br /> Email: spccorp(dUtmail.com <br /> ---------------------------------------------------------------------------------------------------------------------------- <br /> Client: Tracy Ford New Cars Contact : Wayne Maciel, Service Manager <br /> Address: 3500 Auto Plaza Way Phone No.: 209-835-4821 <br /> City/State/Zip; Tracy, CA 95304 Date of Test: 8-23-18 <br /> Product Stored: Waste Oil-a UL#: L-244451 <br /> Tank Information (Brand/gallonage/Fuel Stored/UL or other serial#/miscellaneous) <br /> Containment Solutions/491 gals/Waste Oil/UL142/UL#L-244451/Double Wall SteeUllvrs old(12/2007) <br /> Description of Secondary Containment Integral Secondary Containment <br /> Date of Test 8-23-18 Test Supervisor(s) Todd McWhorter <br /> METHOD OF PERIODIC INTEGRITY TEST-Primary XX SecondaryXX <br /> 1. Steel Thickness Test(in accordance with API-653 and/or STI SP001 (5'h edition)-Readings Steel <br /> _Thickness UL142 min. .093in./Avg Steel thickness =.128 in. actual avg. tested <br /> 2. Inert Gas Blanket <br /> Gas Used: Nitrogen ; CO2: ; Other(specify) <br /> Air Pressure-Test Vacuum Test ; <br /> Initial Reading (document psi/WC readings) Time <br /> End Readings (document psi/WC readings) Time <br /> Duration of Test: %drop <br /> 3. Sonar-Test_Y_N(document db readings) Duration <br /> 4. Camera(visual) model Lorex MC81845/interstitial (Result: P/F) Pass <br /> 5. Hydro-Carbon Sensor(probe)model OMNTEC BOA- (Result: P/F) Pass <br /> 6. Hydrology(Water Column) ( inches of water column readings) <br /> Duration % Drop Results(PIF) <br /> 7. Other: Inspect Primary & Secondary containment AST clearance is 2inches above floor. <br /> CRDM present-no evidence of leaking product from vessel system was easily accessible for <br /> inspection. No evidence of weld breaks,punctures,cracks,or other structural damage to the tank. Leak <br /> detection is assured via inspections of the secondary containment. AST is anchored & is not likely to <br /> move in a seismic event nor a flood event. PASS <br /> TEST RESULTS <br /> V-Stage: <br /> Pass XX 'Fail_(quantify) SENSOR DETECTS NO LEAKS FROM PRIMARY TANK INTO <br /> SECONDARY CONTAINMENT <br /> z—r2° -Stage: <br /> Pass XX Fail_(quantify) NO VISUAL EVIDENCE OF LEAKED PRODUCT IN THE <br /> SECONDARY & STEEL THICKNESS IN EXCESS OF MINIMUM UNDER UL 142 <br /> STANDARD <br /> Comments section data on file <br /> Next Scheduled Periodic Integrity Test: 8-23-23 <br /> SPC Corp Representative <br /> STI SP001 Certified Inspector No.: AST 135013 <br />