Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including, but not limited to,permitting, <br /> access agreements,and notification to required contacts(e.g.site managers, inspectors,clients,subcontractors,etc.). A tailgate safety meeting must be performed and documented at the beginning of <br /> each workday. Sae Performa ce Sel Assessment(SPSA)procedures must be used throughout the project. Weather conditions heat,cold, rain, lightning)must also be considered. <br /> chemical aspects of work; •Employ safe lifting procedures. <br /> Chemical resistant apron for groundwater <br /> sampling aspects,full-face respirator with •Make sure sub-contractors are aware of their responsibilities for labor, <br /> organic vapor cartridges,and other PPE as equipment and supplies. <br /> needed. <br /> •Review permit conditions. <br /> Use North or MSA respirator,MicroFlex <br /> Nitron One nitril gloves,and Aero Ear <br /> Calssic plugs(29 decibel noise reduction <br /> rating). <br /> Visually clew proposed Underground and overhead •Complete Pre-Mobilization section of Borehole Clearance Review form <br /> drilling locations. installations. Attachment 5 and adjust drilling locations as necessary. <br /> Set up necessary traffic Wear reflective traffic vests. Struck by vehicle during •Use buddy system for placing traffic control.Implement traffic control plan such <br /> control. placement. Vehicle accident as as setting out cones and tape defining safety area. <br /> a result of improper traffic <br /> control equipment placement. <br /> Assist with set up of rig. Wear reflective vest for traffic,steel toed and Vehicle accident during rig •All staff should know where the kill switch is for the drilling rig. <br /> shank shoes,hard hat,safety glasses with movement. Damage caused by <br /> side shields,leather gloves. rig while accessing set-up •Verify clear pathway to drilling location and clearance for raising mast. <br /> location. Contact with overhead <br /> installations. Soft terrain. Rig Provide as-needed hand signals and guidance to driver to place rig. <br /> movement. •Visually inspect rig(fire extinguisher on board,no oil or other fluid leaks, <br /> cabling and associated equipment in good condition,pressurized hoses secured <br /> with whip-checks or adequate substitute,jacks in good condition?). <br /> •If necessary,use wooden blocks under jacks to spread load. Chock wheels. <br /> Set up exclusion zone(s)and Struck by vehicle during set up. 0 Implement exclusion zone set-up as follows: circle boring location with caution <br /> work stations(drilling and Sliptfall hazards. tape or traffic cones to indicate exclusion zone. Set up work stations with clear <br /> loggingisample collection). walking paths to and from rig. Use safety tape and cone. <br /> Clear upper five feet of Don required PPE as appropriate for this Back strain,exposure to •Have full-face respirator with organic vapor cartridges within 3-5 feet of work <br /> direct push location using step: steel toed and shank shoes,hard hat, chemical hazards,bitting an area,readily available. <br /> post-hole digger or hand safety glasses with side shields,hearing underground utility,repetitive <br /> auger. protection,reflective safety vest,leather motion. •Initiate air quality monitoring in accordance with Attachment 6. <br /> gloves for the non-chemical aspects of work. <br /> •Stand upwind to avoid exposure whenever possible. <br /> Wear chemical resistant gloves during <br /> handling of soil. Use Microflex Nitron One •Use the organic vapor monitor aggressively to track the airborne concentration <br /> Nitrile gloves when handling soils. of contaminants close to potential sources such as the core as it is being raised <br /> from the hole,the core is opened,etc. <br /> •Evaluate any soil samples inside a Ziploc bag at arm's length. DO NOT <br /> EVALUATE THE SAMPLE IN THE OPEN. THIS WILL AVOID <br /> UNNECESSARY EXPOSURE. <br /> •Use ro r liftin [echni ues and tools. _ <br /> SEC6R International Incorporated 14 Generic HASP <br />