My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012711
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
ARCHIVED REPORTS_XR0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:21:26 PM
Creation date
1/31/2020 11:25:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012711
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> r.- <br /> Quik Stop Markets November 1, 1990 <br /> Project No. 349132-31 Page 2 <br /> meet the requirements set forth herein. The Project Manager/Project Geologist will <br /> ensure that the following items are adequately addressed: <br /> • Safety Supplies and Equipment Inventory <br /> • Medical Surveillance Program/Physical Examinations <br /> E Training Program_s/Hazard Communication <br /> Accident/Incident Reporting Procedures <br /> • Decontamination/Contamination Reduction Procedures <br /> I <br /> The Project Manager/Project Geologist is responsible for the dissemination of the <br /> information contained in this plan to site personnel and to the responsible representative <br /> ? of each subcontractor firm working under Exceltech, Inc. on the project. <br /> r - <br /> The Project Manager/Project Geologist will act as the Site Safety Oticer. The Site <br /> Safety Officer is responsible for ensuring that the following items are adequately <br /> addressed: <br /> 4 Ensure that all personnel on-site adhere to the requirements of the sitc` safety <br /> plan. <br /> • Obtain acknowledgement, on sign-off page enclosed as Attachment A, from all <br /> on-site personnel or visitors regarding their acceptance of the site safety plan <br /> requirements. <br /> ^� Investigate all incidents and accidents and report in writing to the.Corporate <br /> Safety Officer. <br /> -c <br /> ;,„ Ensure that proper personal decontamination points are available. <br /> t. <br /> fd1 . The Project Manager/Project Geologist has the authority'-to suspend work anytime they <br /> �a determine.that the provisions of the plan are inadequate to ensure worker safety. The <br /> Project Manager/Project Geologist shall also inform the Fremont Office Safety <br /> ra Coordinator of individuals whose conduct is not consistent with the requirements of the <br /> s plan. <br /> z <br /> Each individual working.on:or..inspecting-the.site..shall-be responsible.for.reading-this <br /> ►� site safety plan and for acknowledging acceptance of all the requirements thereof by <br /> i' signing the attached sign-off page. Each individual shall be responsible for complying <br /> ' with the.site safety plan and for conducting himself/herself in a.healthy and safe manner <br /> at all times. Each individual shall be responsible for notifying the Site Safety Officer of <br /> p Y� g y <br /> any violations of; or.recommended upgrades to, the project safety plan. <br /> i ma <br /> La <br />
The URL can be used to link to this page
Your browser does not support the video tag.