Laserfiche WebLink
Well Over-Drilling Procedures <br /> A hollow stem auger rig with 10-inch inner diameter augers will be used to overdrill the <br /> borehole for the monitoring well.The existing KP-11S well borehole shall be cleaned out <br /> and cleared of well construction materials (well casing,screen,filter pack,and annular <br /> seal), soil,fly ash,or other debris to a minimum depth of 26 feet below ground surface. <br /> Well cuttings and construction materials shall be placed in 55-gallon drums. <br /> The well/borehole shall be sounded immediately before and after overdrilling to confirm <br /> obstructions that are present are removed prior to filling and sealing. <br /> IDW Management <br /> Soil cuttings,well construction materials,and PPE will be collected in 55-gallon drums <br /> during drilling.PPE and well casing materials will be placed in a separate drum from soil <br /> and fly ash removed from the borehole. Drums will be moved by the subcontractor to a <br /> location designated by Headwaters Resources that is onsite,but outside of the area of fly <br /> ash. <br /> Well Abandonment <br /> A well destruction permit will be obtained from San Joaquin County prior to drilling. A <br /> San Joaquin County grout inspector will be onsite to oversee overdrilling and <br /> abandonment.Well destruction and abandonment shall be performed in accordance with <br /> San Joaquin County Well Standards,Ordinance Code Section 9-1115.6 <br /> (hthi://www.sjgov.org/ehd/docs/pdf/Well%20Standz! is.pdf). <br /> The boring shall be destroyed by completely filling the cleared borehole with cement- <br /> bentonite grout.The grout shall consist of clean water mixed with Type I or II Portland <br /> cement(or equivalent) and bentonite(3 to 5 percent by weight)to help reduce shrinkage. <br /> The cement grout shall consist of not more than two (2)parts by weight of sand and one <br /> (1) part by weight of cement(per bag of cement)to 5 to 7 gallons of potable water. The <br /> well shall be filled by use of a tremie pipe or equivalent.The tremie pipe shall be placed <br /> within 5 feet of the bottom of the cleared borehole and removed as the grout is installed. <br /> Because soil in the surrounding area is contaminated with fly ash, the grout shall be <br /> brought to the existing ground surface,rather than backfilling the borehole with 2 feet of <br /> surrounding material. <br /> Overdrilling and sealing shall be completed in one day.Verification of the sealing shall be <br /> made by a representative of the San Joaquin County Environmental Health Department. <br /> Decontamination and Waste Management <br /> Al}personnel and equipment will be decontaminated before coming onsite and before <br /> leaving the site,as specified in the Site Health and Safety Plan. The subcontractor will be <br /> responsible for providing the appropriate decontamination tools,equipment,solutions, <br /> liquids,containers,and supplies.Prior to equipment and vehicles being removed from the <br /> site,all equipment and vehicles shall be rinsed using potable water,provided by the <br /> subcontractor,using a brush as needed to remove particulate matter and surface films. <br /> KCPPEL-KPI I SABANDONMENTSOW DOC 2 SOLICITATION NO. <br />