My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
375
>
2900 - Site Mitigation Program
>
PR0540905
>
SITE INFORMATION AND CORRESPONDENCE_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 10:22:54 AM
Creation date
2/3/2020 9:23:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2
RECORD_ID
PR0540905
PE
2960
FACILITY_ID
FA0023406
FACILITY_NAME
SIERRA LUMBER MANUFACTURERS
STREET_NUMBER
375
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
147120808
CURRENT_STATUS
01
SITE_LOCATION
375 W HAZELTON AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> )SPO U� CO <br /> SAN JOAQUIN COUNTY <br /> Donna K.Heran,R.E.H.S. Unit Supervisors <br /> < Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> �.� - °�i • Program Manager Douglas W.Wilson,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> JOSEPH EGER <br /> SIERRA LUMBER MANUFACTURERS <br /> PO BOX 6216 <br /> STOCKTON CA 95240 <br /> Re: Sierra Lumber Manufacturers SITE CODE: 001644 <br /> 375 W. Hazelton Ave <br /> Stockton, Ca. 95203 <br /> WORK PLAN' Preliminary Site Investigation Case 2 <br /> DATED: December 27, 2004 <br /> PREPARED BY:AGE <br /> APPROVED: X <br /> DTSAPPRa�ED: <br /> A-D'DENDUM,,EEDED: P Submit bv: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10 (c)(3)]: <br /> 1. To advance 4 soil borings and collect soil samples for analysis. <br /> 2. To complete 4 soil boring to Monitoring Wells. <br /> 3. To develop, survey, monitor, and collect groundwater samples for analysis. <br /> 4. All soil and groundwater samples will be analyzed for: TPH-Gas, BTEX, 5 oxygenates <br /> including 1.2-DCA. <br /> 5. A report of findings, including conclusions and recommendations,will be submitted to EHD <br /> and CVRWQCB for review and comment. <br /> COMMENTS AND CONDITIONS' <br /> 1. Soil samples collected in the former UST area must be analyzed for lead. <br /> 2. Grab groundwater samples from the borings, as proposed, are not required and not <br /> recommended. <br /> 3. EPA Method 8260B is recommended for VOC analysis. <br /> DATED 2&3LD S BY tV <br /> Harlin Knoll, Senior REHS (209)468-3442 <br />
The URL can be used to link to this page
Your browser does not support the video tag.