My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.0 Review and Approval <br /> The Engineer shall review and approve with reasonable promptness <br /> compliance of materials and methods with the Technical Specifi- <br /> cations. Such review and approval shall not relieve the Contractor <br /> from responsibility for any deviation from the Technical Speci- <br /> fication. <br /> 8.0 Qualification of Contractor <br /> The Contractor shall employ only competent workmen for the execution <br /> of this work, and all such work shall be performed under the direct <br /> supervision of an experienced driller satisfactory to the Engineer. <br /> All personnel employed by Contractor shall be acceptable to the <br /> Engineer and the Owner. <br /> Contractor must maintain Comprehensive General Liability insurance <br /> while conducting this work. The Contractor will submit with the <br /> cost proposal certification evidencing that liability insurance is <br /> currently maintained and will be maintained during the period of <br /> this work. <br /> 9.0 Records <br /> During the drilling of each well and boring, a daily driller's <br /> report shall be maintained. This report shall describe the number <br /> of feet drilled, tallies of casings installed, number of drive <br /> samples collected, time on the job, time on site versus off site, <br /> and other pertinent data requested by the Engineer or Owner. <br /> 10.0 Changes in Quantity of work <br /> The Engineer and Owner reserves the right to change the number <br /> and/or depth of wells to be completed under this Project. <br /> 3 <br /> 1130.3:14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.