My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
715
>
2900 - Site Mitigation Program
>
PR0540782
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 2:36:45 PM
Creation date
2/6/2020 9:52:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540782
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0023314
FACILITY_NAME
RMB GARAGE
STREET_NUMBER
715
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905409
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
715 N HUNTER ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> 22 May 2002 <br /> AGE-NC Project No.01-0877 <br /> Page 4 of 9 <br /> !_J <br /> ff 2.4. GROUND WATER DEPTH AND FLOW DIRECTION <br /> I <br /> Based on data obtained from the preliminary site assessment, the depth to ground water at the site <br /> f is approximately 20 to 25 feet below surface grade(bsg).Based on data obtained from a nearby site <br /> (706 North El Dorado Street) the prevailing ground water flow direction in the vicinity of the site <br /> is estimated to be toward the northeast. <br /> 3.0. SCOPE OF WORK <br /> I_I Based on the analytical results from the preliminary site assessment,AGE proposes the installation <br /> of four ground water monitoring wells and one deep soil boring to assess the vertical and lateral <br /> extent of impacted soil and ground water at the site. The assessment activities will consist of the <br /> following tasks: <br /> 10 Permitting and pre-field work preparations; <br /> Ja Drilling and soil sample collection; <br /> U Well installation, development and survey; <br /> u0 Ground water sample collection; <br /> • Preparation of a report of findings. <br /> `- 3.1. PERMITTING AND PRE-FIELD WORK PREPARATIONS <br /> I`l Applicable site assessment permits will be obtained from the San Joaquin County EHD.In addition, <br /> an update to the health and safety plan presently on-file will be prepared in accordance with <br /> Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (National <br /> Institute for Occupational Safety and Health Administration, U.S. Coast Guard and U.S. <br /> Environmental Protection Agency, 1985).Prior to mobilization, each monitoring well location will <br /> be clearly marked and a utility clearance obtained through Underground Service Alert. <br /> LI <br /> 3.2. DRILLING AND SOIL SAMPLING <br /> AGE proposes to install four ground water monitoring wells to define the lateral extent of impacted <br /> soil and ground water at the site. In addition, AGE proposes to advance one deep soil boring to <br /> Advanced GeaEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.