My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012744
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
ARCHIVED REPORTS_XR0012744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:22:06 PM
Creation date
2/11/2020 4:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012744
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fl 11 RA! PI <br /> r� <br /> Results of Initial Investigation and Work Plan December 18, 1990 <br /> ARCO Service Station No. 2076, Lodi, California AGS 30008-2 <br /> f <br /> o Submit soil samples to a State-certified laboratory for analysis of TPHg and <br /> BTEX. Soil samples collected from under the former leaded gasoline tank <br /> will be submitted for analysis of total and organic lead. <br /> o Prepare a report summarizing tank removal operations and our findings, <br /> conclusions, and recommendations. <br /> F'IEW PROCEDURES <br /> Safety Plan <br /> The Site Safety Plan (Appendix D) describes the basic safety requirements for the drilling <br /> k of soil borings at the work site. The safety plan is applicable to personnel of Applied <br /> GeoSystems and to subcontractors of Applied.GeoSystems.. The Applied GeoSystems <br /> geologist will act as the Site Safety Officer. Personnel at the site will be informed of the . <br /> contents of the site safety plan before work begins. A copy of the plan will be kept at"the <br /> 1. <br /> work site and will be available for reference by appropriate parties during the work. E <br /> Ecavation-of Existina Tank Cavity. <br /> A geologist from Applied GeoSystems will be onsite to observe excavation of the soil from <br /> both:tank.cavities. Immediately following the removal of.the five.existing underground- <br /> sforage tanks,the tank cavity.will be excavated to a depth between 2 and 4 feet below the <br /> former tanks to evaluate if hydrocarbons remain in place. During excavation,the geologist <br /> will use a PID to characterize the relative levels of hydrocarbons in the soil arid note any <br /> subjective evidence of hydrocarbons such as obvious product odor and discoloration. Field <br /> instruments such as the PID are useful for indicating relative levels of hydrocarbon vapors, <br /> 1 <br /> but do not detect the concentration of hydrocarbons present with the same precision as <br /> s laboratory analyses. <br /> G <br /> . . 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.