My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0523599
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 4:53:28 PM
Creation date
2/12/2020 3:59:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0523599
PE
2960
FACILITY_ID
FA0015929
FACILITY_NAME
PORT OF STOCKTON BLDG #16
STREET_NUMBER
305
STREET_NAME
FYFFE
STREET_TYPE
AVE
City
STOCKTON
Zip
95201
CURRENT_STATUS
01
SITE_LOCATION
305 FYFFE AVE BLDG 16
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.5 Monitoring Recordkeeping <br /> The SSHO will be responsible for establishing and maintaining records in a project logbook that <br /> will be available for inspection at all times. Required monitoring information is described <br /> below: <br /> • Employee name and task description; <br /> • The date, time, weather conditions, tasks being performed, and relevant comments <br /> will be written in a logbook that will be available for inspection at all times; and <br /> • Any engineering controls used to reduce exposure. <br /> 7.0 SITE CONTROL <br /> 7.1 Site Entry and Security <br /> A tailgate health and safety meeting for all contractor personnel will be conducted prior to site <br /> entry and commencement of work. The site will be visually inspected before task personnel <br /> enter the site. <br /> Daily control and accounting of all personnel present on-site will be accomplished by the <br /> following: <br /> • Daily Tailgate Safety Meeting form to be signed by all personnel present and working <br /> on the site; <br /> • Daily Visitor Log to be signed by all visitors to the site not providing a service to the <br /> project; and <br /> These forms are shown in Attachment C and will be maintained by the SSHO. <br /> 7.2 Site Communications <br /> Internal communication among on-site personnel has been described in Section 3.4 and in <br /> emergency situations, Section 3.8.2. The primary means of external communication shall be <br /> Rough&Ready Island 21 Tetra Tech, Inc. <br /> Revised Draft HSP November 18, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.