Laserfiche WebLink
# Task* Reasonable Cost $ Comments/Changes <br /> 22 Additional Services On-Site For $51 ,226 These costs are based on the cost estimate <br /> Excavation from Land Technology regarding installation <br /> of the shoring system, excavation of <br /> contaminated soil (500 cubic yards), <br /> backfilling and compacting the excavation, <br /> loading and transporting contaminated soil to <br /> Forward Landfill for disposal . (Includes 15% <br /> markup), <br /> 23 Mobile Lab Services During $ 8,685 Costs based on subcontractor's estimate at <br /> Excavation to Test Soil and $ 1 ,737 per day. <br /> Groundwater <br /> 24 Workplan for Abandonment of $0 Information should be included in the initial <br /> 25 ' Groundwater Monitoring workplan (Refer to Task #2). <br /> Well; Drill and Install Two (2) <br /> Wells to 40 ' Sampling Every 5 '; <br /> Drill and Install Two Wells to <br /> 20 ' Sam lin Eve 5 ' . <br /> 25 Health and Safety Plan $0 Health and Safety issues pertaining to the <br /> excavation should be included in the overall <br /> project Health and Safety Plan (refer to Task <br /> #3 <br /> Labor costs are excessive and have been <br /> 26 Professional Services On-Site $ 119996 <br /> for Drilling reduced according to Fund Cost Guidelines. <br /> The Principal Engineer, Principal <br /> Toxicologist, and Environmental Technician <br /> for the on-site field work is not cost <br /> effective. On-site field work labor has been <br /> reduced to a Project Geologist/Engineer at <br /> $90 per hour for 50 hours and the <br /> Environmental Technician at $65 per hour <br /> for 50 hour 's . Project Supervision along with <br /> the scheduling should be performed by a <br /> Project Manager at $105 per hour for 10 <br /> hours. Per-Diem rates seem excessive and <br /> will be evaluated at time of reimbursement. <br /> 27 Laboratory Analysis During $ 19441 <br /> Drillin <br /> 28 Workplan for Shoring for $0 Information should be included in the initial <br /> Excavation of Pit Due to workplan (Refer to Task #2). <br /> Groundwater and Vicinity <br /> Structure <br /> 29 Health and Safety Plan $0 Health and Safety issues pertaining to the <br /> excavation should be included in the overall <br /> project Health and Safety Plan (refer to Task <br /> #3 <br /> Ca/ifoiwia Eu onmeuta/Protecdon Agency <br /> 2ARecrx/edPaoel <br />