My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:19:43 PM
Creation date
2/13/2020 11:48:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
# Task* Reasonable Cost $ Comments/Changes <br /> 30 BEII Professional Services for $0 Labor hours for limited shoring oversight are <br /> On-Site for Shoring included in Task 32. The regulatory directive <br /> dated October 26, 2001 indicates that if <br /> shoring is determined to be necessary, it <br /> should be limited and costo tions explored. <br /> 31 Additional Services for On-Site $0 Costs included in Task 22. <br /> for Shoring <br /> 32 On-Site Professional Service for $55 ,300 Labor costs are excessive and have been <br /> Removal of Soil and reduced according to Fund Cost Guidelines . <br /> Transportation to Landfill The Principal Engineer, Principal <br /> Toxicologist, and Environmental Technician <br /> for the on-site fieldwork are not cost <br /> effective. On-site fieldwork labor has been <br /> reduced to a Project Geologist/Engineer at <br /> $90 per hour for 50 hours and the <br /> Environmental Technician at $65 per hour <br /> for 50 hours. Project Supervision along with <br /> the scheduling should be performed by a <br /> Project Manager at $ 105 per hour for 20 <br /> hours. Per-diem rates seem excessive and <br /> will be evaluated at time of reimbursement. <br /> Disposal of Soil (Landfill Fees) seem <br /> excessive and estimated costs have been <br /> reduced to $75 per ton (including 15% <br /> markup) based on Fund Cost Guidelines. <br /> 33 Fencing to be evaluated forreasonable costs <br /> Miscellaneous Items On-Site $300 at time of reimbursement. <br /> 1-1 TOTAL Reasonable Cost $1289948 <br /> * Task descriptions are the same as those identified in Blakely Environmental' s November 19, 2001 cost <br /> estimate. <br /> Should you decide to obtain the additional bids for satisfying the three-bid requirement, and if you need <br /> assistance in procuring contractor and consultant services for corrective action don't hesitate to call me at <br /> (916) 341 -5674. <br /> Sincerel <br /> Guy Childs, Associate Engineering Geologist <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc : Mr. Sam Savig Mr. David Blakely <br /> San Joaquin EHD Blakely Environmental Investigations, Inc <br /> 304 East Weber Avenue 9605 Arrow Route, Suite T <br /> Stockton, CA 95202 Rancho Cucamonga, CA 91730-4555 <br /> California En vkonmevtalFr otecttnn Agency <br /> 2A Recrc%dPaoer <br />
The URL can be used to link to this page
Your browser does not support the video tag.