Laserfiche WebLink
ri r �v v i -•.v r�. .r .u. ..v i i r r vii • ......r v.. ..r r r u u .a v..•u u r�a v •.0.,.a l u r v ,yam v v r r v v <br /> Mr. Bob Spencer Z 16 March 2009 <br /> West Coast Tomato, Stockton <br /> Our comments are presented below. <br /> 1. Regional Water Board staff concurs with West Coast Tomato's proposal to install six <br /> additional soil borings at the Site to evaluate whether excavation is a viable alternative. <br /> By 15 June 2009,West Coast Tomato needs to install the soil borings, analyze the soil <br /> samples, and submit a report of findings. The report of findings needs to include <br /> recommendations for future work, if necessary. <br /> 2. Regional Water Board staff concurs with West Coast Tomato's proposal to conduct <br /> quarterly groundwater monitoring and sampling of all Site wells, Quarterly monitoring <br /> reports are due by, 1 August, 1 November, 1 February, and 1 May. The Attachment <br /> provides the information that needs to be included in the monitoring reports. <br /> By 15 June 2009, please submit the results of the site investigation and by 1 August 2009 <br /> submit the results of the second quarter 2009 groundwater sampling event. The groundwater <br /> sampling report needs to include all of the information included in the Attachment. If you have <br /> any questions, you may contact me by phone at (916) 464-4619 or by email at <br /> kshelton ,waterboards.ca.gov. <br /> KRISTI SHELTON <br /> Water Resources Control Engineer <br /> Aboveground Tanks Cleanup Unit <br /> J <br /> Attachment <br /> cc: Mr. Garrett Backus, San Joaquin County Environmental Health Department, Stockton. <br /> Mr. Patrick Riddle, Law Office of Patrick D. Riddle, P.C., Acampo <br />