Laserfiche WebLink
Table C — SPCC Plan Revision History <br /> Activity <br /> Name/Signature Date (Scheduled Review or Comments <br /> Amendment) <br /> Avtar Singh 4/24/2020 SPCC Plan rewritten <br /> ENGINEER REVIEW OF SPCC PLAN AMENDMENTS (40 CFR 112.5(c)) <br /> Following any technical amendments to this plan as described above, the amended plan must be certified <br /> by a registered engineer in accordance with 40 CF 112.3(d). <br /> GENERAL SECONDARY CONTAINMENT STRUCTURES (40 CFR 112.7(c)) <br /> Bulk Storage Containers <br /> Tanks AST-1 through AST-4 are double-walled steel ASTs. The tanks are located in a concrete berm <br /> with a net containment capacity of approximately 4,000 gallons. Net containment calculations include <br /> displacement from tanks, pipes, and rainfall. The containment berm will provide sufficient general <br /> secondary containment for the most likely release in the area as described in Table D below. <br /> The four drums located in the northeastern corner of the property are stored on an Eagle Manufacturing <br /> Company Model 1645 secondary containment pallet. The secondary containment pallet has a capacity <br /> of 66 gallons, which will provide general containment for the most likely release in the area. <br /> Joe's Travel Plaza <br /> 15600 Harlan Road,Lathrop,CA <br /> Page 13 <br />