My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2710
>
2900 - Site Mitigation Program
>
PR0545425
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2020 12:20:26 PM
Creation date
3/2/2020 9:27:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545425
PE
2950
FACILITY_ID
FA0010880
FACILITY_NAME
DON LAWLEY CO INC
STREET_NUMBER
2710
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17910043
CURRENT_STATUS
02
SITE_LOCATION
2710 LOOMIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 FIELD INVESTIGATION <br /> During this investigation, thirteen (13) soil borings will be drilled to obtain soil samples for chemical <br /> analyses and lithologic characterization. <br /> 2.1 Permits <br /> A Drilling Permit will be obtained from the San Joaquin County Public Health Services Environmental <br /> Health Division (PHS-EHD) prior to the start of field work. <br /> Underground Service Alert will be notified of our subsurface investigation at least two working days <br /> prior to the start of field work. Clearance notification will be received from all effected utilities. <br /> 2.2 Drillin, and Soil Samples <br /> Soil borings will be positioned to evaluate potential release of regulated substances due to past site <br /> activities (see Figure 3). <br /> • B 1 and B2 will be positioned where scrap equipment and parts have been stored out in <br /> the paved yard areas, along the east property line. These soil borings are planned to <br /> be advanced to 10 feet bsg. <br /> • B3 will be positioned adjacent to where the diesel-fuel-system's dispenser is located. <br /> This soil boring is planned to be advanced to 10 feet bsg. <br /> • B4 will be positioned adjacent to where the inlet pipe enters the clarifier. This soil <br /> boring is planned to be advanced to 15 feet bsg. <br /> • B5 will be positioned adjacent to where the outlet pipe exits the clarifier. This soil <br /> boring is planned to be advanced to 15 feet bsg. <br /> • B6 will be positioned where a possible painting booth was located. This soil boring is <br /> planned to be advanced to 10 feet bsg. <br /> • B7, B8, B9, B10 and B11 will be positioned at unpaved areas where scrap equipment <br /> (and possibly a waste oil above ground tank) had been stored along the south property <br /> line. These soil borings are each planned to be advanced to 10 feet bsg. <br /> • B12 and B13 will be positioned in the surface-drainage basin, near the south property <br /> line. These soil borings are each planned to be advanced to 6 feet bsg. <br /> GEE 2 Work Plan Phase II ESA Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.