Laserfiche WebLink
Report on Soil and Ground-Water Evaluation September 11, 1989 <br /> Proposed ARCO Station, Woodbridge, California AGS 39044-1 <br /> Utilities surrounding the site consist of a 6 inch-diameter high pressure gas line west of the <br /> site in-Main Street. In addition, a Pacific Bell and Pacific Gas and Electric easement is on <br /> the east side of the property in Main Street. We understand from information provided by <br /> ARCO that this right of way has'been abandoned. An 8-inch-diameter water line is-on the <br /> west side of Main Street: :-A 6-inch-diameter sanitary sewer line is east of the site. . The <br /> approximate location of these utilities, as supplied on the-ARCO land planning survey, are <br /> shown on Plate P-2. <br /> FIELD INVESTIGATION <br /> Work conducted for this investigation at the site included performing a soil-vapor survey, <br /> drillingfour soil borings and installing three ground-water monitoring wells in selected <br /> borings. The wells were installed-in areas which we believed would give the needed data <br /> for evaluating the property and ground-water gradient. In addition, the wells were installed <br /> in areas where they wouldremain accessible after construction of the proposed station <br /> facilities. The locations of the monitoring wells relative to other site features are depicted <br /> on Plate P-2. Locations of the-wells-relative to proposed station facilities are depicted on <br /> Plate P-3. Monitoring well. MW-1.and boring B-4 were installed in the area where we <br /> understood the former tanks had- been at the site. Monitoring well MW-2 was located <br /> toward the south side of the property to evaluate that portion of to property and MW-3 was <br /> 5- <br /> App/lead Ge0SYS&Y77S <br />