My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
401
>
3500 - Local Oversight Program
>
PR0545380
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 3:54:02 PM
Creation date
3/4/2020 3:42:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545380
PE
3528
FACILITY_ID
FA0012145
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
401
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
401 S LINCOLN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.4 Report Preparation <br /> A written report will be prepared following receipt of laboratory <br /> analytical results . The report will describe our field <br /> observations, sample collection, laboratory analytical results , <br /> and conclusions regarding the site in estigation activities . The <br /> site investigation report will be submitted to the Client and <br /> SJC-EHD within two weeks of completion of field activities and <br /> receipt of laboratory analytical results . <br /> 5.0 IMPLEMENTATION SCHEDULE <br /> The approximate estimated duration fo each task and the schedule <br /> for the site investigation at the Site is presented below. The <br /> estimated durations and proposed schedule do not include work <br /> delays due to unfavorable weather conditions, acts of God, labor <br /> strikes, and other events beyond the control of ICES and the <br /> Client . <br /> 5.1 Estimated Durations <br /> ACTIVITY ESTIMATED DURATION <br /> (working days) <br /> 1 . Screen for underground utilities 1 - 2 <br /> 2 . Install monitoring wells; collect 2 - 3 <br /> soil and grab groundwater samples <br /> I . <br /> 3 . Develop monitoring wells 1 - 2 <br /> 4 . Sample monitoring wells 1 - 2 <br /> 5 . Laboratory analyses ses 5 - 7 <br /> b . Prepare report 7 - 10 <br /> F <br /> F6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.