Laserfiche WebLink
4.4 Report Preparation <br /> A written report will be prepared following receipt of laboratory <br /> analytical results . The report will describe our field <br /> observations, sample collection, laboratory analytical results , <br /> and conclusions regarding the site in estigation activities . The <br /> site investigation report will be submitted to the Client and <br /> SJC-EHD within two weeks of completion of field activities and <br /> receipt of laboratory analytical results . <br /> 5.0 IMPLEMENTATION SCHEDULE <br /> The approximate estimated duration fo each task and the schedule <br /> for the site investigation at the Site is presented below. The <br /> estimated durations and proposed schedule do not include work <br /> delays due to unfavorable weather conditions, acts of God, labor <br /> strikes, and other events beyond the control of ICES and the <br /> Client . <br /> 5.1 Estimated Durations <br /> ACTIVITY ESTIMATED DURATION <br /> (working days) <br /> 1 . Screen for underground utilities 1 - 2 <br /> 2 . Install monitoring wells; collect 2 - 3 <br /> soil and grab groundwater samples <br /> I . <br /> 3 . Develop monitoring wells 1 - 2 <br /> 4 . Sample monitoring wells 1 - 2 <br /> 5 . Laboratory analyses ses 5 - 7 <br /> b . Prepare report 7 - 10 <br /> F <br /> F6 <br />