Laserfiche WebLink
C) <br /> �I <br /> 3 . 0 WORK DESCRIPTION <br /> 1 . <br /> Tasks to be performed at the Site include installing three <br /> monitoring wells; collecting groundwater samples from the <br /> three monitoring wells; and collecting soil and grab <br /> groundwater samples from three onsite boring locations . <br /> Work activities are planned in the following order (some <br /> activities may be performed concurrently) : <br /> • installation of three monitoring wells <br /> • collecting groundwater samples from the three monitoring <br /> wells <br /> E ' <br /> • collecting soil and grab groundwater samples from three <br /> onsite boring locations I <br /> f <br /> ~ 4.0 KEY PERSONNEL AND RESPONSIBILITIES <br /> 4.1 Site Safety Personnel <br /> Name ResDonsibilities <br /> � I <br /> Peng Leong Project Manager <br /> Derek Wong Site Safety Officer <br /> � . Peng Leong Health and Safety Director j <br /> I <br /> i <br /> 4 .2 ICES Personnel and Responsibilities <br /> The responsibilities of the ICES personnel listed in Section <br /> 4 . 1 are outlined below. <br /> 4.2.1 ICES Project 'Manager <br /> I <br /> The ICES Project Manager, Peng Leong, has the ultimate <br /> responsibility for the health and safety of ICES personnel on <br /> site . As part of his duties, Mr. Leong shall be responsible <br /> for. <br /> • keeping the ICES Health and Safety Director informed of <br /> project developments <br /> • ensuring that on--site ICES personnel receive the proper <br /> training, and are informed of potential hazards <br /> 4 <br />