ORDINANCE NO 1275 <br /> PAGE NO 26 <br /> . Assistant Director of Public Works, using the procedures prescribed <br /> in Section 13 020.070 of this ordinance, the results of this <br /> monitoring shall be included in the report <br /> (3) Compliance Schedule Progress Reports All persons found to be in <br /> violation of this Waste Ordinance, the industrial discharge permit, or any State <br /> or Federal regulation prohibiting or limiting waste discharge, may be required <br /> to prepare a schedule of actions to bring the discharge into compliance under <br /> the direction of the Assistant Director of Public Works <br /> The Director of Public Works shall have the final authority to determine if an <br /> action is acceptable and appropriate, to set the time frame to complete <br /> compliance action, to set the frequency of required compliance reporting, to <br /> set the frequency for required sampling, to set monitoring and inspection <br /> requirements, and to determine any additional actions necessary for the user <br /> to meet the compliance schedule on a timely basis <br /> Any user subject to a Compliance Schedule shall submit to Manteca, for each <br /> compliance step in the Schedule, a report stating whether or not compliance <br /> was achieved Where a compliance schedule milestone is not met, the report <br /> must state the reasons for noncompliance, the steps being taken to comply <br /> with the Compliance Schedule, and the date when the compliance will be <br /> met Each report must be submitted not later than 14 days after the date of <br /> the compliance step, specified in the Compliance Schedule <br /> The following conditions shall apply to the compliance schedule required by <br /> Section 13 020 060 (b) (2) (vii) of this ordinance <br /> (i) The schedule shall contpin progress increments in the form of dates <br /> for the commencement and completion of major events leading to <br /> the construction and operation of additional pretreatment required <br /> for the user to meet the applicable pretreatment standards (such <br /> events include, but are not limited to, hiring an engineer, completing <br /> preliminary and final plans, executing contracts for major <br /> components, commencing and completing construction, and <br /> beginning and conducting routine operations), <br /> (ii) No increment referred to above shall exceed nine (9) months, <br /> (iii)The user shall submit a progress report to the Assistant Director of <br /> Public Works no later than fourteen (14) days following each date in <br /> the schedule and the final date of compliance including, as a <br /> minimum, whether or not is complied with the increment of <br /> progress, the reason for any delay, and, if appropriate, the steps <br /> being taken by the user to return to the established schedule, and <br /> (iv) In no event shall more than nine (9) months elapse between such <br /> • progress report to the Assistant Director of Public Works <br />