Laserfiche WebLink
Winston#209 <br /> Manteca,CA <br /> August 8,2002 <br /> 2.0 PROJECT METHODOLOGY <br /> This Phase I Environmental Site Assessment was performed in accordance with Goodyear's <br /> Combined Phase I and Phase HEnvironmental Site Assessment Specification.The scope ofwork <br /> for this ESA included but was not limited to: <br /> • A review of regulatory records available for documented soils and/or groundwater <br /> contamination investigations conducted at the Site; <br /> ` • A Site reconnaissance conducted by SECOR personnel to evaluate present conditions and the <br /> surrounding area of the Site; <br /> r <br /> • Interviews with Site representatives and occupants, as well as local officials; <br /> ►. • A Limited Subsurface Investigation; and <br /> • Presentation of the results of our assessment in this report. <br /> r <br /> The conclusions presented in this report are professional opinions based on data described herein. <br /> These opinions are based on the limitations described in Appendix A. <br /> r <br /> r <br /> r <br /> r <br /> r <br /> 0042 gy store 209 phase 2 reviewedl SECOR International Incorporated <br /> 2 <br /> r <br />