My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:15:13 AM
Creation date
3/9/2020 10:01:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Technic Inc. <br /> Confirmation GW Sampling WP <br /> Project No. 770.2 <br /> February 28,2011 <br /> collected from each borehole. The samples will be collected using small diameter poly <br /> tubing with a Waterra® check-ball attachment and gently transferred into VOA vials. <br /> - <br /> Groundwater samples will be submitted to a California Certified Laboratory for the analyses <br /> outlined in Section 2.5 below. <br /> 2.3 Conformational Groundwater Sampling(Water Supply Wells) <br /> Per the SJC PHS/EHD directive dated January 11, 2011, conf�rmational groundwater <br /> samples will be collected in the water supply wells within 600 feet of the site. As discussed <br /> in Section 2.1 above, the number and location of water supply wells within 600 foot radius of <br /> the release will be confirmed by review of DWR logs followed by site reconnaissance. <br /> i <br /> 2.3.1 Groundwater Sampling Procedure <br /> Before sampling is attempted, water supply well samplingports will be decontaminated in an <br /> Alconox® solution and will be double-rinsed with de-ionized water. Water supply wells will <br /> then be purged by activating their respective well pumps for ten to fifteen minutes prior to <br /> sample collection. <br /> Once purging is complete, a groundwater sample will be collected from the sampling port. <br /> Care will be taken to minimize sample agitation. Once the sample container is filled and <br /> capped, the bottle will be inverted, tapped and checked for;headspace bubbles. The sample <br /> container will be identified and labeled with a unique designation, inserted into foam holders <br /> and placed into an ice chest cooled to 4°C for transport to the laboratory. <br /> Disposable gloves will be used by the sampling technician to collect all samples and will be j <br /> changed with each sample collection. <br /> A chain of custody document, listing all samples collected, will accompany the samples from <br /> field to laboratory, thereby providing a means to track their movement and ensure their <br /> i <br /> integrity. <br /> All water purged from the water supply wells will be considered unregulated material and <br /> will be discharged to the land. <br /> 2.4 Conformational Groundwater Sampling (Monitoring Wells) <br /> Per the SJC PHS/EHD directive dated January 11, 2011, conformational groundwater <br /> - <br /> - - W-7. <br /> samples will be collected from MW-1, MW 4, MW 5, MW 6 and M t[- <br /> i <br /> Geological Tec&ks Inc. 5 <br /> 7702 Confirmation GW Sampling 2-25-1 Ldoc <br /> I , <br />
The URL can be used to link to this page
Your browser does not support the video tag.