Laserfiche WebLink
January 9, 1997 - WJH submitted a report covering the above work, and requested the site be <br /> closed. Refer to that report titled `Results of 11/27196 Groundwater Sampling and Request for <br /> Closure" for more details. <br /> March 25, 1997. - The San Joaquin County PHS, EHD informed the owners that the Technical <br /> Review Committee had reviewed the site and would not approve site closure. The EHD <br /> required an additional monitoring well to be placed on the property, <br /> April 3, 1997 - WJH submitted a workplan to perform the work required. <br /> April 15, 1997 - The San Joaquin Co. EHD approved the workplan with modifications. <br /> Sept. 4, 1997-Monitoring well #4 was placed as shown on PLATE H. Soil& water samples <br /> revealed minor amounts of gasoline compounds, but significant levels of TEPH as diesel. (See <br /> TABLES II& III details.) Water samples taken in December, 1997, and March& July, 1998 <br /> from MW-1 & MW-4 showed minor amounts of TEPH as diesel; BTEX& TPHg were below <br /> detection limits. The results of all water analyses are summarized on TABLE A. <br /> PROPOSED WORKPLAN: (Revised January 8, 1999) <br /> Upon receipt of approval of the workplan from the San Joaquin EHD, bids will be solicited from <br /> qualified drilling contractors and other vendors, and a package prepared for submittal to the <br /> State Cleanup Fund for pre-approval of the work. When that is received, the work will be <br /> scheduled as soon as possible. Your office will be notified at least 48 hours prior to <br /> commencing operations. <br /> A copy of a general health & safety plan is attached as EXHIBIT B. <br /> 1. The approximate locations of MW-5 & MW-6 are shown on PLATE H. MW-5 will be <br /> placed first. The final location of MW-6 may be adjusted depending upon the results of field <br /> observations during the placement of MW-5. After obtaining a drilling permit from the San <br /> Joaquin Co. EHD, mobilize properly licensed auger rig equipped with sufficient hollow-stem <br /> flights to complete each soil boring/well without having to decontaminate augers, <br /> 2. Depth to water will be determined in either MW-1 or MW-4 prior to beginning operations. <br /> 3. Soil sampling equipment to consist of either(a) conventional 18" split-spoon sampler, or(b) <br /> wireline operated continuous coring device. At least two (2) devices will be available so that <br /> one can be cleaned while the other is in use. <br /> 4, Both MW-5 & MW-6 will be sampled at 5 foot intervals from 15'below grade to 100', or <br /> until three (3) consecutive samples do not show any evidence of contamination. Samples will be <br /> screened with a PID or similar device; those which reveal evidence of contamination will be <br /> 3 <br />