Laserfiche WebLink
Fuller Mobile Home Park <br /> 363 E. Louise Ave-, Lathrop, California January 28, 1998 <br /> Eastern Soil Contaminatin Boundary and Confirmation Work Plan Page: 2 <br /> ND (None Detected), but the groundwater sample had BTEX contamination. B-6 was <br /> ND for both soil and water. Monitoring well MW-4 was installed in the sidewalk of <br /> Bizzibe Street in the apparent down-gradient direction. Laboratory soil samples were <br /> obtained at five, ten and twenty-five feet below ground level (Tables 1 & 2). <br /> On December 21, 1994, after receiving the analytical results from the previous borings, <br /> WHF drilled and installed three monitoring wells, MW-5, 6 and 7. Each was 25 feet deep <br /> and soil samples were taken at five and ten feet. All soil samples tested "ND" (Table 1). <br /> Monthly depth to water readings are being recorded and the groundwater gradient <br /> calculated for each month. The past gradients have been irregular, probably due to the <br /> fact that the gradient is extremely flat and the lithology is probably affecting stabilization <br /> of the minor fluctuations across the site (Appendix A). <br /> 3.0 Scope of Work <br /> Eastern Boundary Confirmation <br /> A single slant hand auger boring will be accomplished at the east boundary ry ofth <br /> e <br /> property in the area of the former UST location. The boring will be advanced on a <br /> 30° angle to accomplish a vertical depth of 15.0 below grade level (bgl). Soil <br /> samples will be collected every five (5) foot for laboratory analysis. Since this is a <br /> sampling exercise, no boring logs will be completed. The site has already been <br /> well characterized geologically (Figure 3). <br /> Confirmation Borings <br /> Four (4) hand auger borings will be completed in the formerly explored areas <br /> around borings B-1, B-2, B-3 and B-4 as shown on Figure 3 of this Work Plan. <br /> The hand borings will be advanced to -12.5 bgl of the former surface grade. This <br /> is due to the construction of a storm retention pond in 1993. Again no boring log <br /> will be completed as this is a confirmation exercise to identify petroleum <br /> hydrocarbon contamination remaining around the previously investigated area. A <br /> single soil sample will be collected at the termination of each hand boring. <br /> 3.1 Drilling <br /> The soil borings will be accomplished using a hand auger to accomplish the <br /> shallow sampling borings. <br /> All drilling equipment will be thoroughly cleaned before drilling begins, to prevent <br /> { the introduction of contamination from off site, and between borings to prevent <br /> L cross contamination. <br />