Laserfiche WebLink
` 1 <br /> page 2, 1196 Louise Ave. <br /> The Report states that an 8-hour dual-phase extraction test.was conducted at the site in <br /> February 2001, and that the results of the test indicate that remediation of the <br /> groundwater contamination by dual phase vapor extraction would be a viable option for <br /> this site. As stated in PHS/EHD correspondence dated April 23, 2001, a report of this <br /> test has not been submitted to PHS/EHD for review. The Report further states that it is <br /> the intent of Quik Stop Markets, Inc. to conduct similar 8-hour tests once a month, until a <br /> permanent system is installed on site. <br /> The work plan expresses the opinion of CCI "...that interim remediation of the shallow <br /> aquifer should be initiated as soon as possible". As discussed in the April 23, 2001 <br /> correspondence, PHS/EHD appreciates the interim remediation efforts for plume.control <br /> that Quik Stop Markets, Inc. has made to protect a nearby municipal well,-and agrees <br /> that these interim measures should continue. Future plans for the site include the <br /> monthly dual-phase extraction events, and conductance of a pumping test to determine <br /> the radius of influence from the site extraction well. Following completion of the <br /> definition of the contaminant plume and of the feasibility studies, a Corrective Action <br /> Plan will be submitted to PHS/EHD for review. <br /> If you have any questions or comments please call Lori Duncan at (209)468-0337. <br /> Donna Heran, RENS, Director <br /> Environmental Health Division <br /> Cr L_ <br /> Lori Duncan, Senior REHS Dot Lofstrom, R.G. <br /> LOP/Site Mitigation Unit IV Engineering Geologist <br /> I <br /> cc: Marty Hartzell, CVRWQCB i <br /> George Yamashita, c/o Jeffrey Widman <br /> Gary Mulkey, CCI <br /> I <br /> i <br /> I <br /> i <br /> I <br />