My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
510
>
3500 - Local Oversight Program
>
PR0545486
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 5:03:36 PM
Creation date
3/10/2020 2:50:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545486
PE
3528
FACILITY_ID
FA0005611
FACILITY_NAME
ROYAL OAKS SAVINGS
STREET_NUMBER
510
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
510 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WW Environmental Consultants, Inc. <br /> Health & Safety Plan <br /> Page: 4 <br /> More stringent protective equipment requirements will be implemented if <br /> necessary. This determination will be made by the project supervisor after <br /> review of the materials to be handled, the ambient monitoring data, consultation <br /> with on-site technical personnel, the Safety Officer, and the proper management <br /> personnel. Upgrades in PPE, if necessary, will be implemented. <br /> 2.2 General Safety <br /> The on-site Safety Officer will be responsible for the following daily safety <br /> implementations: <br /> 2.3 Daily Safety Meetings <br /> Each day prior to commencing work, a safety meeting shall be held to discuss <br /> safety considerations for the day's work to be done. A safety topic shall be <br /> addressed each day from the following list: <br /> - Site Safety Plan (first day and once a week thereafter) <br /> Fire Fighting Techniques <br /> - Defensive Driving <br /> Decontamination <br /> - Levels of Protection <br /> - Heat Stress <br /> Emergency Equipment on Site <br /> C, - confined Space Entry Procedure - Respirator Maintenance <br /> L - Self-contained Breathing Apparatus Training (if necessary) <br /> L2.4 Safety Log <br /> A safety log shall be kept for the project work site. <br /> L <br /> 2.5 Eating, Drinking, Smoking <br /> L <br /> Eating, drinking, and smoking shall be allowed only in the designated areas in <br /> the support zone. No personnel may eat, drink, or smoke on-site in any other <br /> }" area except as permitted by the SSO. <br />
The URL can be used to link to this page
Your browser does not support the video tag.