My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
3500 - Local Oversight Program
>
PR0545509
>
ARCHIVED REPORTS_XR0005226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 8:17:05 AM
Creation date
3/10/2020 3:55:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005226
RECORD_ID
PR0545509
PE
3528
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
02
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Table 4 includes a summary of the groundwater monitoring well completion data for the Jamar <br /> site. Well completion diagrams are in Attachment 5. <br /> 4.3 C-SpargeTM Remediation Operation Summary <br /> C-SpargeTM remediation system operating statistics for the period of June 17, 2004 through <br /> ' September 30, 2004 are summarized in Table 5. Attachment 1 contains the field data (i.e., <br /> including pressures maintained at each sparge point and operation data for the system). This <br /> attachment also contains tables summarizing the monthly data and field detail in support of Table <br /> 5. The injection rates were assumed to be mid range, approximately, 2.5 SCFM. <br /> ' During the month of June 2004, the C-SpargeTM system operated 240.77 hours (i.e., actual hours) <br /> and 2.12 pounds of 03 were injected. This was only, a partial month of operation since the <br /> remediation system was started on June 17, 2004. These results are also the total for the Second <br /> ' Quarter 2004. <br /> Respectively, during July, August and September, the C-SpargeTM system operated 536.73, <br /> ' 339.19 and 204.97 actual hours. Respectively, 4.73, 2.99 and 1.807 pounds of 03 were injected <br /> during July, August and September 2004. For the Third Quarter 2004 the system was operated <br /> 1080.89 hours (i.e., actual hours) and 9.53 pounds of 03 were injected. <br /> Actual operation from system start-up on June 17 to September 30 2004 was 1,321.66 hours. <br /> During this period, 11.66 pounds of 03 were injected. The system was non-operational, which <br /> ' includes scheduled non-operation, scheduled maintenance and down time, for 1,210.34 hours <br /> during this period. <br /> ' 4.4 Remediation System Monitoring <br /> 4.4.1 Objectives of Remediation System Monitoring <br /> The primary objective of the Jamar Property C-SpargeTM operation is to reduce the mass of <br /> ' contaminants in the saturated and unsaturated zones in a technically effective but also cost <br /> effective manner. In order to evaluate the reduction of mass, the objectives for monitoring the C- <br /> SpargeTM System at the Jamar property are listed below: <br /> ■ Quantification of the volume of 03 injected and injection pressures maintained; <br /> ■ Quantification of the system operation time; and <br /> ■ The overall effectiveness of the C-SpargeTM remediation system as monitored by two --- <br /> indicators: <br /> 1. VOC reduction in individual onsite groundwater monitoring wells based on <br /> laboratory analysis; <br /> 2. Dissolved oxygen (DO) field determinations in groundwater grab samples from <br /> individual monitoring wells. <br /> ' S:V68231QM reports12004 3QR.doc 7 ATC Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.