My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2900 - Site Mitigation Program
>
PR0505510
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 2:18:03 PM
Creation date
3/11/2020 1:13:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0505510
PE
2950
FACILITY_ID
FA0006825
FACILITY_NAME
SHELL GAS & SERVICE STATION
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10416004
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTENTIONAL TECHNOLOGY CORPORATION <br /> - 3 . 0 METHODOLOGY <br /> This investigation will consist of three soil borings : <br /> • two to a depth of twenty feet <br /> • one to a depth of fourty-five feet <br /> The soil borings will be located as shown in Figure 2 . Sampling <br /> and analysis are described in Sections 3 . 1, 3 . 2 and 3 . 3 . <br /> 3 . 1 SOIL BORING/SAMPLING <br /> ._ Prior to the commencement of drilling, all underground utilities <br /> will be located. Soil borings will be advanced using a hollow <br /> stem auger drill rig. A California C-57 licensed driller will be <br /> subcontracted to perform the drilling services . The IT field <br /> geologist will conduct a tailgate safety meeting at the beginning <br /> of the iay to insure that field activities are performed in <br /> accordance with the Health and Safety Plan (Appendix A) . <br /> Prior to drilling at each borehole, all augers will be thoroughly <br /> steam cleaned. The split spoon sampler and brass tube inserts <br /> will be cleaned prior to each sampling event with a non-phosphate <br /> detergent scrubbing followed by a water rinse, and a final <br /> distilled water rinse . Boreholes will be logged and soil samples <br /> will be obtained by using a modified California sampler under the <br /> direction of IT' s field geologist . Soils will be described using <br /> the visual method of the Unified Soil Classification System <br /> (USCS) . Sampling methods will include grab samples for soil <br /> description and examination as well as samples in decontaminated <br /> brass tubes for laboratory analysis . Samples will be obtained of <br /> vadose zone soils every five feet until the borings have reached <br /> design depth. <br /> Each sample recovered, as well as representative drill cuttings, <br /> will be screened for the release of volatile organic contaminants <br /> with an organic vapor analyzer equipped with a photoionization <br /> detector . The calibration of this instrument will be confirmed <br /> by the field geologist each day prior to use . Upon sample <br /> 3 <br /> - MA:ENG : 9284MER/050691 <br />
The URL can be used to link to this page
Your browser does not support the video tag.