Laserfiche WebLink
0 6 <br /> the tubing will have to be sacrificed by leaving it in the casing during detonation.As a result, she would require at least <br /> 50 grain detonation cord to ensure proper perforation of the casing if the tubing(tremie) is planned to be left in place <br /> during detonation. <br /> Can you please provide the details as to how the destructions of the wells with diameters of%inch and 1 inch plan to be <br /> done? <br /> Sincerely, <br /> Gabriel Gonzalez <br /> 2 <br />