Laserfiche WebLink
Project No. 034-17016 <br /> Site-Specific Health& Safety Plan <br /> Page No. I 1 <br /> • The two(2) foot samples in the five(5) foot deep borings and 10 foot samples in the 10 foot deep <br /> borings will be analyzed for TPH-cc, VOCs, CAM 17 metals, and PCBs. The five (5) foot deep <br /> samples will be placed on hold pending receipt of the analytical results of the other samples in each <br /> boring. <br /> 3. TRUCK/TRAILER WASH BAY OIL/WATER SEPARATORS/CLARIFIERS/TRENCH <br /> DRAINS <br /> The investigation within the truck/trailer wash bay/oil water separators/clarifier trench drain will include the <br /> trench drain,subsurface clarifiers located within the truck wash bay and an oil/water separator located outside <br /> of the truck wash bay to the east. The scope of work for the investigation includes the following: <br /> • Seven(7)soil borings will be completed in the truck/trailer wash bay area as follows: <br /> o Two(2)soil borings will be completed to a depth of five(5)feet bgs near the trench drains. <br /> Soil samples will be collected at depths of two(2)and five(5)feet bgs. <br /> o Two(2)soil borings will be completed to a depth of 10 feet bgs,one(1)adjacent to each of <br /> the two(2)interior subsurface clarifiers in the truck bay area. Soil samples will be collected <br /> at depths of five (5)and 10 feet bgs. <br /> o Two(2)soil borings will be completed to a depth of 10 feet bgs as close as practical to the <br /> outside oil/water separator. Soil samples will be collected at depths of five(5)and 10 feet <br /> bgs. One(1)of the soil borings will be deepened to a depth of approximately 20 to 30 feet <br /> bgs and a grab groundwater sample will be collected and analyzed for TPH-cc,VOCs,CAM <br /> 17 metals, and PCBs. Depending on the results of field screening, a soil sample may be <br /> collected from the capillary fringe and analyzed for TPH-cc, VOCs, CAM 17 metals, and <br /> PCBs. <br /> o One (1) soil vapor boring will be completed to a depth of 5.5 feet bgs near the outside <br /> oil/water separator. One (1)soil vapor sample will be collected and analyzed for VOCs. <br /> • The two(2)foot samples in the five(5) foot deep borings and 10 foot samples in the 10 foot deep <br /> borings will be analyzed for TPH-cc, VOCs, CAM 17 metals, and PCBs. The five (5) foot deep <br /> samples will be placed on hold pending receipt of the analytical results of the other samples in each <br /> boring. <br /> 1.3 Key Personnel&Responsibilities <br /> The following personnel will have the overall responsibility for the safe operation of this investigation: <br /> Project Director: Art Farkas <br /> Corporate Safety Officer: Dean Alexander <br /> Task Leader: Michael Bowery <br /> On-Site Safety Task Leader: Michael Bowery <br /> It is the responsibility of the above-designated safety officers and task leaders to: <br /> • Implement, the site safety training program for project field team members as described in this <br /> document. <br /> • Assure that field personnel have read and understand this Health& Safety Plan. <br /> • Establish effective traffic and pedestrian control around the subject site. <br /> KRAZAN&ASSOCIATES,INC. <br /> With Offices Serving the Western United States <br /> 03417016 SSI Lathrop HASP Final.doc <br />