My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005380
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3310
>
3500 - Local Oversight Program
>
PR0545561
>
ARCHIVED REPORTS_XR0005380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 12:19:11 AM
Creation date
3/17/2020 4:22:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005380
RECORD_ID
PR0545561
PE
3528
FACILITY_ID
FA0009490
FACILITY_NAME
KENTS OIL SVC INC
STREET_NUMBER
3310
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339005
CURRENT_STATUS
02
SITE_LOCATION
3310 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L.t•�'w.. :t t'i..a+k[# -.M,s3ah.C. <br /> i <br /> Hygienist will be present during this activity to monitor for ,' --- <br /> explosive <br /> oraexplosive environments within the tank. In addition, the . <br /> Stockton Fire Department will' be on-site as required, to perform <br /> regulatory compliance inspections. <br /> ' The removed sections of roof will be staged in -an adjacent <br /> area on-site for off-site removal preparation. Removed sections <br /> will be initially scraped to remove large globules and crusts and <br /> ' subsequently cleaned with penetone power cleaner in a 10:1 <br /> solution of water, where applicable. Solution will be applied <br /> j generously to the surface and scrubbed with brushes to remove <br /> visible residue. The steel will be cleaned over a visqueen apron <br /> covered with 3-4 inches of dirt excavated during initial staging <br /> , . _ activities. , The dirt will absorb the generated rinsate and act- <br /> as an insulation for falling slag pieces created during <br /> ' subsequent cutting of the steel into manageable sized pieces for <br /> disposal off-site. <br /> Once cleaned and cut, the steel will be staged. for <br /> subsequent loading into haul trucks upon completion of the tank <br /> removal activities. <br /> CLEANING OF INTERNAL SURFACES <br /> J A <br /> Once the roof of the tank has been completely removed, the <br /> remaining tank residue will be solidified for bulk removal, <br /> transport and disposal. Native soil from the tank perimeter will <br /> be added to the remaining stored contents for solidification. <br /> Specifically, soil excavated. during removal of underground lines <br /> around the tank will' be used initially for solidification. If <br /> additional soil is required, the south end of the tank perimeter <br /> ' will be excavated and soil placed into the compartments.. To achieve solidification, soil will be added in sufficient quantity <br /> to allow no passage of liquid through the standard paint filter <br /> test as required for solid waste classification and disposal. <br /> ' Soil will be mixed with the residue by use of an excavator <br /> located adjacent to the tank. The excavator will be equipped <br /> with 'a flat plate for mixing and removal from the tank floor. <br /> Material located in difficult access areas will be mixed and <br /> removed manually by OHM crews. <br /> Cleaning of the tank by use of a steam cleaner or hot water <br /> blaster is not anticipated. This method has been eliminated due <br /> to the higher degree of difficulty in meeting acceptance criteria <br /> ' for a liquid waste stream for disposal versus a' solid waste <br /> stream. <br /> 253 <br />
The URL can be used to link to this page
Your browser does not support the video tag.