'' „rs-�{'"� 'T" •f -•lc:'!-' 'Y4S�: Zi.r •�. -{'-' N�- x a n - _ .=b '.;'` ..:as-...Z.' <br /> -v- <br /> i <br /> J <br /> cut-off Lsaw and/or non-sparking excavator shears. Holes will be <br /> strategically placed in the walls for placement of rigging <br /> anchors to assist in supporting and lifting the .sections as they <br /> are removed. Each section will be removed by .use of: an excavator <br /> and placed into the metal staging area for off-site removal <br /> ' . preparation. <br /> As the initial' exterior wall is removed, OHM crews will advance eastward, removing both internal and external walls <br /> simultaneously. Each removed 'section will be placed into the <br /> metal staging area for preparation to remove off-site. Once the <br /> ' removed sections have been staged, they will be cleaned and cut <br /> into manageable sized pieces as previously outlined in the roof <br /> removal section. Heat coals removed during the internal cleaning' <br /> phase will be processed in the metal staging area along with the . <br /> removed sidewalls. <br /> FLOOR REMOVAL <br /> 1 Once the sidewalls have been completely removed, OHM crews . <br /> will remove the floor. The floor will 'becut i s <br /> for initial removal from the excavation. Las powered cut-of <br /> saws an or non-sparking shears will be used or cutting the tank <br /> floor since conditions beneath the tank are unknown. Lifting <br /> eyes will be placed at strategic locations for ease of lifting. <br /> Leading edges of the cut sections will be lifted by excavator to <br /> break any potential suction seals prior to actual removal. <br /> Blocks will be placed beneath the lifted edges and the sections <br /> will be removed by the excavator using nylon slings. Removed <br /> sections will be staged into the metal processing area for <br /> subsequent off-site disposal preparation. <br /> Once the floor has been completely removed, OHM crews will <br /> obtain soil samples at intervals of two (2) per removed <br /> compartment. Samples will be analyzed for TPH, and BTXE, as <br /> ' required by the SJCEHD. Additional sampling and/or analyses will <br /> be performed if required -by the involved regulatory agency(s) . A <br /> comprehensive sampling plan is attached- to this work plan. <br /> REMOVAL AND DISPOSAL OF TAN <br /> ion-o removal and disposal preparation <br /> Upon com� I-et <br /> activities, OHM crews will load the metal onto flat bed trucks <br /> for transport and disposal. The metal will be transported to a <br /> local metal recycling facility for final disposal. Final <br /> ' determination as to whether the metal is suitable as a non- <br /> hazardous recycled material shall be the decision of SJCEHD+—) <br /> i <br /> � i <br /> 255 <br />