Laserfiche WebLink
Woodward-Clyde Consultants <br /> 5) Agreed. Excavation personnel are wearing respirators and complying with Level C <br /> requirements. We have requested that ENS CO Environmental implement air monitoring <br /> for operations generating considerable dust. <br /> 6) Agreed. Positive ventilation using fans is employed. Emergency ingress and egress is <br /> available. Ear plugs are available for use by site personnel when required. <br /> 7) Exclusion and decontamination areas are in place. <br /> 8) A minimum rest period of 15 minutes per hour has been established <br /> 9) All on-site project personnel have received training as required by 29 CFR 1910.120 <br /> (Documentation available). <br /> 10) Sanitation facilities are provided for staff. Washwater is being handled as described. <br /> 11) ENSCO personnel have an established hand-signal code. <br /> Sincerely <br /> onathan K. Tuck <br /> Senior Project Engineer <br /> cc: <br /> J. O' Connor, Lika <br /> J. Neal, Lika <br /> V. Rose,ENSCO Environmental <br /> R. Valinoti, S. J. Local Health District <br /> C. Vais, WCC <br /> S. Alton, WCC <br /> A. Gokoffski, WCC <br /> Attachment: <br /> DHS letter(copy) <br />