My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1664
>
2900 - Site Mitigation Program
>
PR0545518
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2020 2:01:57 PM
Creation date
3/26/2020 1:54:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545518
PE
2950
FACILITY_ID
FA0025841
FACILITY_NAME
PROPOSED UNOCAL SERVICE STATION
STREET_NUMBER
1664
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
02
SITE_LOCATION
1664 MARCH LN
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan March 5, 1990 <br /> Proposed Unocal Station, Stockton, California AGS 30010-1W <br /> FIELD PROCEDURES <br /> Safetv Plan <br /> The attached site safety plan (Applied GeoSystems, February 22, 1990) describes the basic <br /> safety requirements for the drilling of soil borings at the work site. The safety plan is <br /> applicable to personnel of Applied GeoSystems and to subcontractors of Applied <br /> GeoSystems. The Applied GeoSystems geologist will be the Site Safety Officer. Personnel <br /> at the site will be informed of the contents of the site safety plan before work begins. A <br /> copy of the plan will be kept at the work site and will be available for reference by <br /> appropriate parties during the work. <br /> Drilling Procedures <br /> Before drilling, a permit will be acquired from the SJPHS for drilling five soil borings; one <br /> boring at each corner of the property and one boring in the center of the property. Applied <br /> GeoSystems will contact Underground Service Alert at least 48 hours before drilling to <br /> delineate public utility lines at the site prior to initiating drilling. Before drilling, each <br /> borehole will be hand-augered 3 to 5 feet below grade. <br /> The soil borings will be drilled using a truck-mounted rig equipped with 8-inch-diameter, <br /> continuous-flight, hollow-stem augers. Auger flights will be steam-cleaned to minimize the <br /> 6 <br /> Agjol ed GeoSystems <br />