Laserfiche WebLink
California Rep&nal Water Quality C*trol Board <br /> Central Valley Region <br /> Robert Schneider,Chair <br /> Winston H.Hickox Sacramento Main Office JUL 10 2003 Gray Davis <br /> Secretaryfor Internet Address: http://www.sw b.ca.gov/mgcb5 Governor <br /> Environmental 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Protection Phone(916)255-3000•FAX(916)255-3015 ENVIRUNMENT HEALTH <br /> PERMIT/SERVICES <br /> 9 July 2003 <br /> Mr. Jeffrey Baker <br /> Tesoro Petroleum Companies, Inc. <br /> 3450 South 344th Way, Suite 100 <br /> Auburn, WA 98001 <br /> APPROVAL OF CORRECTIVE ACTION PLAN, STOCKTON TERMINALS TECHNICAL <br /> COMMITTEE, PORT OF STOCKTON, SAN JOAQUIN COUNTY <br /> Staff of the Central Valley Regional Water Quality Control Board(Regional Board) have reviewed the <br /> 28 April 2003 Corrective Action Plan (CAP) and the 27 June 2003 Response to RWQCB Letter Dated <br /> May 9, 2003 and Addendum to Corrective Action Plan Dated April 30, 2003 (CAP Addendum) submitted <br /> by SECOR International Incorporated on behalf of the Stockton Terminals Technical Committee (STTC). <br /> The STTC is composed of ARCO Products Company, ST Services, Tesoro Petroleum Company, and <br /> Time Oil Company, which operate the bulk fuel terminals at the Port of Stockton. Regional Board staff's <br /> 9 May 2003 letter included eight comments on the CAP. The CAP Addendum addresses those eight <br /> comments as well as concerns discussed in the 20 May 2003 meeting between Regional Board staff and <br /> STTC representatives. The CAP and CAP Addendum propose the installation of 59 ozone injection <br /> wells, a contingency plan in the event that concentrations downgradient from the ozone injection wells <br /> increase, and natural attenuation monitoring in each of the four water bearing zones. <br /> The CAP and CAP Addendum satisfy the Regional Board's requirement for a remedial system to address <br /> site pollution. The concentrations listed in the contingency plan are not the cleanup goals for this site, but <br /> are sufficient to trigger the contingency plan. Therefore, the CAP and the CAP Addendum are approved. <br /> Based on the schedule provided in the CAP Addendum, by 21 May 2004, please submit the system startup <br /> and ozone well installation report. All quarterly monitoring reports need to include installation and startup <br /> status updates. If you have any questions, you may contact Ms. Devra Lewis at (916) 255-3119. <br /> Cep <br /> THOMAS R. PINKOS <br /> Executive Officer <br /> cc: Ms. Margaret Lagorio, San Joaquin County Environmental Health Department, Stockton <br /> Port of Stockton, Office of Environmental and Regulatory Affairs, Stockton <br /> Mr. Ralph Moran, Atlantic Richfield Company, La Palma <br /> Ms. Anne Wilkinson, Time Oil Company, Seattle, WA <br /> Mr. Richard Brandes, ST Services,Martinez <br /> Mr. Steve Osborn, Kinder Morgan Energy Partners, L.P.,Rocklin <br /> Mr. Rusty Benkosky, SECOR International Inc., Sacramento <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our Web-site at http://www.swrcb.ca.gov/mgcb5 <br />